Skip to main content

TransCore wins Virginia ATM contract

The Virginia Department of Transportation (VDOT) has selected TransCore to design and build its I-66 ATM (Active Traffic Management) system on northern Virginia’s main highway into the District of Columbia - one of Virginia’s most congested interstates.
April 23, 2013 Read time: 2 mins
The 1747 Virginia Department of Transportation (VDOT) has selected 139 Transcore to design and build its I-66 ATM (Active Traffic Management) system on northern Virginia’s main highway into the District of Columbia - one of Virginia’s most congested interstates.

TransCore will provide turnkey ITS design, construction, integration and testing services for the program. Once complete, operation of the system will be managed by the Virginia DOT Public Safety Transportation Operations Center, which will monitor traffic and roadway conditions around the clock, collecting data via equipment such as vehicle detection sensors, closed-circuit television cameras, lane control signal systems, adaptive ramp metering, enhanced detection and camera systems, lane management systems, and queue warning systems.

Meanwhile, the Santa Clara Valley Transportation Authority’s (VTA) State Route 237 Express Lanes, for which TransCore serves as lead integrator, received the 2012 Transportation Project of the Year Award from the San Francisco Bay Area Institute of Transportation Engineers (ITE) for being a key benefit to the public by providing commuters with an additional travel option.

This project utilises TransCore’s unique combination of traffic management and toll systems expertise and includes development of the system software as well as design and installation of AVI equipment, dynamic message signs, traffic monitoring detectors and CCTV cameras.

Related Content

  • September 10, 2024
    IBTTA announces Toll Excellence & DEI Awards winners
    Projects range from congestion relief programmes to enhancing community engagement
  • July 23, 2015
    Jacobs JV awarded contract for California high speed rail
    The Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design. The California High Speed Rail is the first true high-speed rail being constructed in the United S
  • November 29, 2022
    ITS Australia Awards: finalists revealed
    Cisco, Moovit and Q-Free are among the companies up for 13th ITS Australia Annual Awards
  • July 27, 2016
    US DOT announces 2016 funding for clean buses
    The US Department of Transportation’s Federal Transit Administration (FTA) has announced the 20 transit providers in 13 states which will receive a share of US$55 million under its Low or No-Emission (Low-No) Bus Competitive Grant Program. The program provides funding for buses and related technology that replaces aging diesel fuel buses with battery-electric or fuel cell-powered vehicles and incorporates other innovations. Among the projects selected to receive 2016 Low-No funding are the Santa Clara Va