Skip to main content

Temporary journey time solution aids smart motorway works

Temporary intelligent transport system (ITS) solutions provider, Mobile Visual Information Systems (MVIS), is to supply its first temporary journey time solution for long-term constant use on a smart motorway project. In partnership with traffic management specialist Vysionics, MVIS developed a temporary journey time solution for continuous operation throughout the two year installation of the smart motorway scheme between junctions 28 and 31 of the M1. The temporary system provides real time journey inf
August 12, 2014 Read time: 2 mins

Temporary intelligent transport system (ITS) solutions provider, 6918 Mobile Visual Information Systems (MVIS), is to supply its first temporary journey time solution for long-term constant use on a smart motorway project.

In partnership with traffic management specialist 604 Vysionics, MVIS developed a temporary journey time solution for continuous operation throughout the two year installation of the smart motorway scheme between junctions 28 and 31 of the M1. The temporary system provides real time journey information to 170,000 road users as they negotiate the road works across both carriageways during project’s duration, minimising journey disruption and promoting safety.

The system uses eight MVIS VMS-C signs which communicate with Vysionics’ own Vector integrated ANPR cameras via MVIS’ Web Studio web-based sign management and control system, providing real time journey information to drivers at strategic points along the route.  

The cameras send vehicle number plate data back to a remote server which calculates journey times, and the average journey time is relayed to MVIS’ signs throughout the works.

When necessary, control centre operators can override the default journey time information display with additional driver information, for example regarding incidents ahead, thereby negating the need for additional signs.

MVIS’ sales manager, Graeme Lee said:  “This is the first time that we have sold our signs for long-term, constant use within a journey time solution on a smart motorway scheme and we are tremendously proud to be playing such an important role in this significant project.” 

For more information on companies in this article

Related Content

  • Boom times for SRL
    October 29, 2021
    SRL also offers the lighter weight Instaboom Lite or use on short duration operations,
  • Vysionics integrates processing in Specs Vector 3
    August 12, 2015
    The latest addition to the well-known Vysionics’ Specs family is Specs3 Vector, which is based on the established Vector integrated ANPR camera. Unlike earlier Specs platforms, Specs3 vector is a fully integrated camera unit with all the camera, processing and communications modules built into a single, elegant housing.
  • UK's Hindhead tunnel pushes the boundaries of traffic management
    January 23, 2012
    The new Hindhead Tunnel is the first in the UK to use radar-based incident detection. Paul Arnold, project manager with the Highways Agency, talks about the project. The comparatively remote location of the A3 Hindhead Tunnel has resulted in it becoming one of the most sophisticated in the UK in terms of monitoring and control systems, according to Paul Arnold, project manager for the Highways Agency (HA), which manages strategic roads in England and Wales. It is the first tunnel in the UK to use radar for
  • Lindsay zips-up lane closure solution
    May 11, 2017
    Moveable barrier systems are offering engineers a new traffic management options. Work zones - be they for maintenance or road widening - are a fact of life and when they occur on major highways, they create no end of problems for traffic planners and travellers alike.