Skip to main content

Temporary journey time solution aids smart motorway works

Temporary intelligent transport system (ITS) solutions provider, Mobile Visual Information Systems (MVIS), is to supply its first temporary journey time solution for long-term constant use on a smart motorway project. In partnership with traffic management specialist Vysionics, MVIS developed a temporary journey time solution for continuous operation throughout the two year installation of the smart motorway scheme between junctions 28 and 31 of the M1. The temporary system provides real time journey inf
August 12, 2014 Read time: 2 mins

Temporary intelligent transport system (ITS) solutions provider, 6918 Mobile Visual Information Systems (MVIS), is to supply its first temporary journey time solution for long-term constant use on a smart motorway project.

In partnership with traffic management specialist 604 Vysionics, MVIS developed a temporary journey time solution for continuous operation throughout the two year installation of the smart motorway scheme between junctions 28 and 31 of the M1. The temporary system provides real time journey information to 170,000 road users as they negotiate the road works across both carriageways during project’s duration, minimising journey disruption and promoting safety.

The system uses eight MVIS VMS-C signs which communicate with Vysionics’ own Vector integrated ANPR cameras via MVIS’ Web Studio web-based sign management and control system, providing real time journey information to drivers at strategic points along the route.  

The cameras send vehicle number plate data back to a remote server which calculates journey times, and the average journey time is relayed to MVIS’ signs throughout the works.

When necessary, control centre operators can override the default journey time information display with additional driver information, for example regarding incidents ahead, thereby negating the need for additional signs.

MVIS’ sales manager, Graeme Lee said:  “This is the first time that we have sold our signs for long-term, constant use within a journey time solution on a smart motorway scheme and we are tremendously proud to be playing such an important role in this significant project.” 

Related Content

  • January 30, 2012
    Managed motorways, hard shoulder running aids safety, saves time
    The announcement that, in 2012/13, work to extend Managed Motorways to Junctions 5-8 of the M6 near Birmingham in the West Midlands is scheduled to start marks the next step for the UK's hard shoulder running concept, first introduced on the M42 in 2006. The M6 scheme is in fact one of several announced; over the next few years work will start on applying Managed Motorways to various sections of the M1, M25 London Orbital, M60 and M62. According to Paul Unwin, senior project manager with the Highways Agency
  • April 23, 2014
    Transport Scotland opts for Vysionics average speed enforcement
    Traffic control specialist Vysionics ITS has won a deal to deliver Europe’s longest average speed enforcement system. This will be installed on a 220km stretch of the A9 in Scotland. The installation will be the first time average speed cameras will have been used on such a long stretch of road on a permanent basis, rather than for short term use during road repairs. The current road configuration is a mixture of single and dual carriageway which carries a high proportion of HGV traffic. Part of the lon
  • March 23, 2015
    Workzone safety system deemed a success
    The first commercial implementation of Safelane automated traffic management has been deemed a success by its developer, Mobile Visual Information Systems (MVIS). Traffic management firm Chevron used Safelane during its management of a full carriageway closure on a bridge replacement project for Balfour Beatty on the M56 in Cheshire, UK. Safelane is part of the first collection of temporary road maintenance safety solutions combining modular electronic perimeters and variable message signs (VMS), launched l
  • June 12, 2015
    Temporary CCTV poses more challenges than permanent installations
    Long-term roadworks pose particular problems for temporary surveillance installations. Converting the hard shoulder to a running lane, either full- or part-time, is the UK Highways Agency’s solution to ease motorway congestion. This is leading to a number of long-term projects where large stretches of the hard shoulder are closed off by temporary concrete barriers and during these roadwork programmes, temporary CCTV cameras are deployed to monitor and record vehicle traffic and workers.