Skip to main content

Norway to renovate 200 tunnels

The Norwegian Public Roads Administration (Statens Vegvesen) has to renovate 200 tunnels before 1 April 2019 to meet European Union safety requirements for tunnels. Norway’s Tunnel Safety Regulations 2007 apply to tunnels on state roads that are more than 500 metres long, of which Norway has 253. Thirty of these were built after 2007 and comply with the regulations, while only around twenty tunnels built after 2007 have been renovated. The authority will present an action program for the 2014-2017 period
August 12, 2013 Read time: 2 mins
The Norwegian Public Roads Administration (7446 Statens Vegvesen) has to renovate 200 tunnels before 1 April 2019 to meet 1816 European Union safety requirements for tunnels.

Norway’s Tunnel Safety Regulations 2007 apply to tunnels on state roads that are more than 500 metres long, of which Norway has 253.  Thirty of these were built after 2007 and comply with the regulations, while only around twenty tunnels built after 2007 have been renovated.  The authority will present an action program for the 2014-2017 period based on the National Transport Plan. It will include an overview of the tunnels and measures to be prioritised during the four-year period, says Lars Aksnes, Deputy Director General of the authority.

In many of the tunnels, only minor measures will be needed to meet the safety requirements, but some tunnels will require extensive measures, says Aksnes. These include power to emergency lighting, radio, fire-fighting equipment, new tunnel control technology, as well as the construction of new escape routes.

Related Content

  • September 15, 2016
    Deadlines approach for Europe’s automatic crash alert system
    The EU-co-funded I_ HeERO (Infrastructure_ Harmonised eCall European Pilot) project is working to ensure the readiness of national networks of call centres - known as public safety answering posts (PSAPs) - to deal with automated crash alerts arriving via the continent-wide 112 emergency phone number. Following on from its HeERO and HeERO2 pre-deployment predecessors, which enjoyed €16m (US$17.76m) in EU funding, the new initiative runs from 1 January 2015 to 31 December 2017. It has €30.9 million (US$34.
  • July 18, 2013
    Norway’s central tolling system contract extended
    The Norwegian Public Road Administration has extended its contract with Q-Free to operate the country’s central tolling system. The contract was due to expire in November 2014, but has been extended for a minimum of 7.5 months. The extension has a minimum value of approximately US$5.6 million. The CSNorway contract was initially signed in 2007 and included the development of the system and conversion of all existing systems into one common central system. Around forty different concessions are running on th
  • December 16, 2014
    Dynamic charging boosts electric vehicles’ potential
    With an increasing need to use electric vehicles in city centres to reduce pollution, David Crawford looks at various solutions to power delivery. The UN’s September 2014 Climate Summit has added fresh momentum to the drive to increase urban electric vehicle (EV) takeup. It has launched the Urban Electric Mobility Initiative, which wants to see EVs accounting for 30% of all urban travel by 2030, and make cities worldwide more friendly to their use. Encouragingly, the plan is being well supported by commerci
  • November 27, 2014
    Norway implements radar-based AID in sub-sea tunnels
    Automatic incident detection (AID) manufacturer Navtech Radar has ventured into the tunnels of Norway and has supplied its radar-based ClearWay solution for the sub-sea 4.5 km long Mastrafjord Tunnel and the 5.8 km long tolled Byfjord Tunnel near Stavanger in Norway as part of a recently-completed tunnel refurbishment project. Radar AID was specified by consultants Multiconsult and following a tender process, systems integrator Trafsys was the winning bidder with the ClearWay solution. Multiconsult s