Skip to main content

ITS ‘could save Australia US$500 million a year’

According to Australia’s federal infrastructure and transport minister, Anthony Albanese, an Australia-wide electronic freeway management system has the potential to greatly reduce congestion and save Australian families and businesses more than US$500 million a year. Albanese said as much as he announced the US$21 million contract to deliver an Intelligent Transport System (ITS) and communications infrastructure to the Westgate freeway managed motorway project in Victoria under the national smart managed m
February 22, 2013 Read time: 2 mins
According to Australia’s federal infrastructure and transport minister, Anthony Albanese, an Australia-wide electronic freeway management system has the potential to greatly reduce congestion and save Australian families and businesses more than US$500 million a year.

Albanese said as much as he announced the US$21 million contract to deliver an Intelligent Transport System (ITS) and communications infrastructure to the Westgate freeway managed motorway project in Victoria under the national smart managed motorways program.

Albanese said that, once operational, the technology will give 4728 VicRoads the tools it needs to better manage traffic flows and respond quickly to accidents and breakdowns.
“As well as being good for taxpayers, this technology will deliver faster, safer and less frustrating driving conditions for the 160,000 motorists and truck drivers who use this vital part of Melbourne’s road network every day,” said Albanese.

Victoria’s roads minister Terry Mulder said the installation of the freeway management system is expected to be completed by mid-2014 and maintains Victoria’s reputation as a leader in the use of this technology.

“The project will upgrade the existing smart technology on the freeway and include installation of lane use signs that advise drivers of which lanes to use, and new side-mounted variable speed limit signs allowing for speeds to adjust to suit conditions,” Mulder said. “There will also be closed circuit television cameras and an upgrade of supporting communications networks and central control systems. Once complete, the system will be fully integrated with the M1 east of Williamstown Road and eventually with the M80 ring road, helping to deliver safer and more reliable travel times along these routes.”

Under the contract, 7146 Visionstream, part of 4977 Leighton Contractors, will be undertaking the design, supply, installation and integration of ITS devices including lane use signs, variable message signs, traffic data collection stations and CCTV cameras and supporting ICT infrastructure. (See ITS International e-newsletter of 14 February).

The West Gate Freeway project is being funded by the Federal and Victorian governments to the tune of US$12.5 million each. Work on the project is expected to get underway in the middle of this year.

For more information on companies in this article

Related Content

  • Q-Free tolls go live on Sydney Harbour Bridge
    February 21, 2024
    Contract in Australian city also includes Sydney Harbour Tunnel crossing
  • Cheshire’s M6 to become smart motorway
    July 2, 2015
    Draft regulations to introduce variable mandatory speed limits as part of the planned smart motorway upgrade to 18 and a half miles of the M6 in Cheshire were published this week for consultation with key stakeholders. Highways England is planning to start construction work on the US$299 to US$427 million project between junction 16 at Crewe and junction 19 at Knutsford later this year. The hard shoulder will be converted into a permanent extra running lane and smart motorway technology installed to give
  • Siemens automation for Dutch road tunnel
    November 14, 2013
    In a deal worth around US$16 million, Siemens, in association with local construction company BAM, is supplying the road and tunnel technology for the Leidsche Rijn tunnel in the Dutch city of Utrecht. Siemens will also maintain the installed technology for a period of three years. Handover of the tunnel is scheduled for summer 2015. The 495 metre long tunnel is designed to relieve traffic congestion in the new Leidsche Rijn district which is currently under construction to the west of Utrecht. The new t
  • ‘Formation flying’ engineering trains used to upgrade railway
    February 16, 2017
    In a bid to increase efficiencies and reduce delays for passengers, the UK’s Network Rail is trialling ‘formation flying’ engineering trains to repair and renew the 20,000 miles of railway track it is responsible for maintaining. It says this new approach to engineering could potentially save taxpayer-funded Network Rail US$313,000 (£250,000) per week in costs by allowing trains to run at higher speeds once engineering is complete. The pioneering technique was used successfully at Sandy, Bedfordshire, on