Skip to main content

Innovative use of CCTV on Niantic River Movable Bridge Project

Earthcam has revealed an innovative construction camera deployment on the Niantic River Movable Bridge Project in Connecticut where work began in February on an Amtrak railroad bridge scheduled for completion in May, 2013.
March 1, 2012 Read time: 2 mins
39 EarthCam has revealed an innovative construction camera deployment on the Niantic River Movable Bridge Project in Connecticut where work began in February on an 2008 Amtrak railroad bridge scheduled for completion in May, 2013.

Amtrak sought a solution to how it could record and document progress on a relatively remote construction site where there is virtually no infrastructure nor communications bandwidth and provide both remote project management and transparency with access to the general public.

An equally important challenge arose; how could project managers conduct cost-effective meetings and monitor the jobsite when the engineering company contracted for the project is located in Philadelphia, over 200 miles away?

After successfully providing a complete webcam system solution for Amtrak at their Thames River Project, EarthCam was engaged again to design a construction camera solution that would provide live video monitoring of the jobsite saving repeated trips to the location and hence, time and dollars.

EarthCam selected one of its 300-plus solutions, suggesting to install and maintain its ConstructionCam, a wireless all-weather, 420x zoom, 360 degree pan streaming video network camera system at the Niantic River Movable Bridge Project.

Meetings between the project manager, the construction crew and the engineering team in Philadelphia are now held on line utilising EarthCam's multi-functional Control Center 7 software service. The project manager can actually point, tilt and optically zoom the camera as needed from his computer utilising EarthCam's powerful software package, allowing the engineers to see any portion of the project they need to examine in high-resolution. Additionally they are able to check accurate weather details, view a time lapse movie or make use of any number of other system tools. To further extend Amtrak's investment, the camera images are fed to a public website to support local community relations.

The Amtrak project manager uses the site to his advantage also keeping an eye on the real time river traffic from his desktop computer. With continual live streaming of the jobsite (as opposed to a camera which only updates every 15-minutes), he can head off a potential problem or concern (a large barge and/or tug coming up or down river) before it becomes an issue. He also monitors inspections in real time, as well as reporting and documenting the project with all-in-one easy-to-use technology provided by EarthCam.

For more information on companies in this article

Related Content

  • Virtual traffic management centres, a new direction in traffic monitoring
    January 30, 2012
    David Crawford picks up a new direction trend in traffic monitoring The surprise winner in the Traffic Management Centre (TMC) category of the recently-announced 2011 OSMOSE (Open Source for MObile and SustainablE city) Awards for European innovations in urban transport, is the Danish city of Aalborg - which doesn't have a TMC. Alternatively, one might consider its 'virtual' TMC as a signpost for the future in medium-sized cities.
  • WIM system certification is a complex business
    February 21, 2018
    There are interesting moves afoot to create Germany’s first Weigh-In-Motion enforcement site in Hamburg – but Florian Weiss of Traffic Data Systems warns that WIM certification is a complex business. In the past, Weigh-In-Motion (WIM) was mainly used for statistical (WIM-S) and pre-selection (WIM-P) applications. These abbreviations - as well as WIM-E (enforcement) and WIM-T (tolling) - were created by Traffic Data Systems during Intertraffic 2006 in Amsterdam. This was also the year when we started the
  • USDOT finances Ohio River Bridges East End Crossing
    April 17, 2015
    US Transportation Secretary Anthony Foxx has announced a Transportation Infrastructure Finance and Innovation Act (TIFIA) loan of US$162 million from the Department's Federal Highway Administration to finance the East End Crossing section of the Louisville-Southern Indiana Ohio River Bridges Project. At the total cost of US$1.27 billion, the East End Crossing includes the East End Bridge and its connecting roadways. The bridge spans the Ohio River eight miles to the north connecting the east end of Louis
  • Major European project for safer cycling
    November 8, 2016
    A major EU project is studying ways of facilitating the interaction between cyclists and motorists with the help of technical aids in order to reduce the risk of accidents. Project Xcycle, which involves researchers from six European countries, aims to find ways of achieving greater equality for cyclists in traffic, encouraging more cycling, and making travel by bicycle safer. The Swedish Road and National Transport Research Institute (VTI) is a major player in the project and are responsible for evaluating