Skip to main content

Indra's technology manages the Málaga subway system

Metro de Málaga in Spain has commissioned Indra to design and implement the control centre that will manage the entire metro infrastructure, including both the rail traffic and the stations. Indra has also implemented the ticketing and access control systems at all the stations on the two subway lines that currently service the city of Málaga.
October 23, 2014 Read time: 2 mins
Metro de Málaga control centre

Metro de Málaga in Spain has commissioned 509 Indra to design and implement the control centre that will manage the entire metro infrastructure, including both the rail traffic and the stations. Indra has also implemented the ticketing and access control systems at all the stations on the two subway lines that currently service the city of Málaga.

The control centre is equipped with Indra's advanced subway management solution and includes the integration of the ticketing, operation planning and traffic regulation sub-systems and allows operators to monitor trains in real time. It provides a tool for supervising and controlling all the fixed installations such as stairs, elevators, ventilation, low voltage, the video surveillance system, access control and the intercom and PA systems, ensuring operators can monitor all subway systems and stations from their workstation in real time.

Indra has also implemented a latest-generation data centre to support the activities of the control centre and communications integrated in an IP platform, allowing users to communicate with every system from the same device. The control station also incorporates a SCADA system to manage energy consumption and a SCADA control system for the fixed installations.

Metro de Málaga has also opted to use Intra’s ticketing and access control systems. This contactless technology validates tickets when they are held in front of a scanning device, thus speeding up the entry and exit of passengers.

The use of state-of-the-art management technology provides Metro de Málaga with the capacity to access information in real time, facilitating the decision-making process and offering users a safer, more efficient and eco-friendly service.

For more information on companies in this article

Related Content

  • Mexico’s Durango-Mazatlan highway sets tunnel safety standard
    August 26, 2016
    Mauro Nogarin looks at the management of the longer tunnels on Mexico’s Durango-Mazatlan highway. In recent years the National Infrastructure Fund of Mexico has increased investment in the installation of ITS systems on selected highways to increase road safety. One such major investment is the 230km long Durango-Mazatlan highway which is 12m in width and has an average speed of 110km/h.
  • Alstom chooses GMV for Sydney’s new light rail system
    April 13, 2016
    Technology company GMV has been chosen by Alstom to supply an advanced fleet management system with in-station passenger information for the new light rail system being built by the ALTRAC consortium of Alstom, rail operator Transdev, Acciona and Capella in Sydney, Australia. Alstom is responsible for the integrated tramway system for the 12 kilometre line, including the design, delivery and commissioning of 30 coupled Citadis X05 trams It will also provide the power supply equipment, including APS gr
  • Indra to upgrade Algeria’s Bouïra tunnel
    September 2, 2015
    The National Road Agency of Algeria (ANA) has awarded a contract for the modernisation of the Bouïra tunnel to a consortium comprising of the state construction company Cosider TP and Indra. The contract, which is worth US$12.3 million to Indra, will run for 15 months. It will deliver an integrated management solution and intelligent traffic systems for the tunnel, which is located on the east-west highway and crosses the country from the border with Tunisia to the border with Morocco and sees the heavi
  • Indra to implement ticketing technology for new Algerian trolley line
    September 7, 2015
    Alstom Transport has awarded Indra a US$3 million contract to develop and implement the ticketing systems for the first trolley line currently under construction in the Algerian city of Setif. With a total length of 22.2 kilometres, the Setif trolley line project is being undertaken by Entreprise du Métro d’Alger (EMA), which has subcontracted the construction to Alstom Transport and the construction company Yapi Merkezi. Indra will supply ticketing systems for the 27 stations and four interchanges p