Skip to main content

Improving safety at Mersey Tunnel

Consultant Parsons Brinckerhoff will upgrade the fire fighting systems in the Mersey Tunnel in the UK. This move will improve the tunnel’s safety measures and bring it into line with stringent new requirements being introduced right across Europe. Under the terms of the deal international consultant Parsons Brinckerhoff has a contract to help Merseyside Integrated Transport Authority upgrade and modernise fire fighting systems in the Kingsway tunnels, which are two of the longest road tunnels in the UK. The
April 19, 2012 Read time: 2 mins
Consultant 4983 Parsons Brinckerhoff will upgrade the fire fighting systems in the Mersey Tunnel in the UK. This move will improve the tunnel’s safety measures and bring it into line with stringent new requirements being introduced right across Europe. Under the terms of the deal international consultant Parsons Brinckerhoff has a contract to help Merseyside Integrated Transport Authority upgrade and modernise fire fighting systems in the Kingsway tunnels, which are two of the longest road tunnels in the UK. The twin bore tunnels run 2.25km between Liverpool and Wallasey under the River Mersey and were originally built in the 1970s. The fire fighting infrastructure is now in need of upgrade to meet European regulations, which were introduced following fatalities in serious tunnel fires in Austria and Switzerland. Parsons Brinckerhoff is evaluating the existing fire fighting facilities in the twin tunnels and will design new systems along with nearly 100 fire hydrant points along the routes. The company has assisted the client in its selection of a main contractor and will now provide management and inspection services throughout the contractor’s installation contract. The demanding programme has seen Parsons Brinckerhoff leading feasibility, detailed design and programme management in close coordination with the client and other stakeholders including the emergency services. Final design proposals cover the tunnels and approach highways and include an installation approach to minimise disruption. Maintaining the integrity of the fire fighting protection on this busy commuter route during the works is essential and passenger safety has been a major priority

For more information on companies in this article

Related Content

  • Queensland extends emergency vehcile priority system
    December 18, 2014
    Following encouraging results from an initial small-scale trial of an emergency vehicle priority system in Queensland, Australia, the scheme is now being extended. In an emergency every second counts. Nowhere is this more graphically illustrated than by the survivability statistics for the time to cardiopulmonary resuscitation of pre-hospital cardiac arrest: at four minutes the survival rate is 22% but by 14 minutes the survival has dropped to 5% - as can be seen from the graph below. There is a similar tre
  • Citilog ITS helps avert tragedy in Vuache Tunnel
    June 25, 2025
    Automatic incident detection systems allowed ATMB to close tunnel
  • Global mobility study: world on the move
    November 27, 2020
    ERF reviews impact of new mobility on road infrastructure in 20 countries pre-Covid
  • Government green lights road and rail improvements
    July 19, 2013
    UK Transport Secretary Patrick McLoughlin has confirmed a £1.2 billion order for more state of-the art trains to transform rail travel on one of Britain’s busiest intercity routes. The 270 carriages will be manufactured in Britain by Hitachi Rail Europe as part of the government’s overall £5.8 billion Intercity Express Programme (IEP). The trains will operate on the East Coast Main Line from 2019 and will deliver significant benefits to passengers, including boosting capacity by 18 per cent, improving trai