Skip to main content

Improving safety at Mersey Tunnel

Consultant Parsons Brinckerhoff will upgrade the fire fighting systems in the Mersey Tunnel in the UK. This move will improve the tunnel’s safety measures and bring it into line with stringent new requirements being introduced right across Europe. Under the terms of the deal international consultant Parsons Brinckerhoff has a contract to help Merseyside Integrated Transport Authority upgrade and modernise fire fighting systems in the Kingsway tunnels, which are two of the longest road tunnels in the UK. The
April 19, 2012 Read time: 2 mins
Consultant 4983 Parsons Brinckerhoff will upgrade the fire fighting systems in the Mersey Tunnel in the UK. This move will improve the tunnel’s safety measures and bring it into line with stringent new requirements being introduced right across Europe. Under the terms of the deal international consultant Parsons Brinckerhoff has a contract to help Merseyside Integrated Transport Authority upgrade and modernise fire fighting systems in the Kingsway tunnels, which are two of the longest road tunnels in the UK. The twin bore tunnels run 2.25km between Liverpool and Wallasey under the River Mersey and were originally built in the 1970s. The fire fighting infrastructure is now in need of upgrade to meet European regulations, which were introduced following fatalities in serious tunnel fires in Austria and Switzerland. Parsons Brinckerhoff is evaluating the existing fire fighting facilities in the twin tunnels and will design new systems along with nearly 100 fire hydrant points along the routes. The company has assisted the client in its selection of a main contractor and will now provide management and inspection services throughout the contractor’s installation contract. The demanding programme has seen Parsons Brinckerhoff leading feasibility, detailed design and programme management in close coordination with the client and other stakeholders including the emergency services. Final design proposals cover the tunnels and approach highways and include an installation approach to minimise disruption. Maintaining the integrity of the fire fighting protection on this busy commuter route during the works is essential and passenger safety has been a major priority

For more information on companies in this article

Related Content

  • Land of ITS opportunities
    February 2, 2012
    Geographically, Russia, the largest country in the world, is vast. So too are the opportunities for the global ITS community, which is why ITS Russia has been actively promoting the country and the opportunities that abound there. ITS Russia is reaching out around the world. In October, at the 17th ITS World Congress in Busan, South Korea, a cooperative agreement was signed with ITS America to promote and strengthen research, educational, and commercial cooperation in the ITS field among the two association
  • Land of ITS opportunities
    February 6, 2012
    Geographically, Russia, the largest country in the world, is vast. So too are the opportunities for the global ITS community, which is why ITS Russia has been actively promoting the country and the opportunities that abound there
  • Virtual traffic management centres, a new direction in traffic monitoring
    January 30, 2012
    David Crawford picks up a new direction trend in traffic monitoring The surprise winner in the Traffic Management Centre (TMC) category of the recently-announced 2011 OSMOSE (Open Source for MObile and SustainablE city) Awards for European innovations in urban transport, is the Danish city of Aalborg - which doesn't have a TMC. Alternatively, one might consider its 'virtual' TMC as a signpost for the future in medium-sized cities.
  • Indra wins in India with two transport and traffic contracts
    November 30, 2015
    Indra has increased its penetration of the Indian transport and traffic by winning two contracts with a total value of US$12.5 million to deploy its technology in the longest tunnel in Southeast Asia, between Chenani and Nashri, and in the Navi Mumbai metro system, in India's financial capital, both currently under construction. Under the first contract, Indra is responsible for the design, supply, set-up and rollout of the control system for the 9.2 km long tunnel and will equip the control center with