Skip to main content

Improving safety at Mersey Tunnel

Consultant Parsons Brinckerhoff will upgrade the fire fighting systems in the Mersey Tunnel in the UK. This move will improve the tunnel’s safety measures and bring it into line with stringent new requirements being introduced right across Europe. Under the terms of the deal international consultant Parsons Brinckerhoff has a contract to help Merseyside Integrated Transport Authority upgrade and modernise fire fighting systems in the Kingsway tunnels, which are two of the longest road tunnels in the UK. The
April 19, 2012 Read time: 2 mins
Consultant 4983 Parsons Brinckerhoff will upgrade the fire fighting systems in the Mersey Tunnel in the UK. This move will improve the tunnel’s safety measures and bring it into line with stringent new requirements being introduced right across Europe. Under the terms of the deal international consultant Parsons Brinckerhoff has a contract to help Merseyside Integrated Transport Authority upgrade and modernise fire fighting systems in the Kingsway tunnels, which are two of the longest road tunnels in the UK. The twin bore tunnels run 2.25km between Liverpool and Wallasey under the River Mersey and were originally built in the 1970s. The fire fighting infrastructure is now in need of upgrade to meet European regulations, which were introduced following fatalities in serious tunnel fires in Austria and Switzerland. Parsons Brinckerhoff is evaluating the existing fire fighting facilities in the twin tunnels and will design new systems along with nearly 100 fire hydrant points along the routes. The company has assisted the client in its selection of a main contractor and will now provide management and inspection services throughout the contractor’s installation contract. The demanding programme has seen Parsons Brinckerhoff leading feasibility, detailed design and programme management in close coordination with the client and other stakeholders including the emergency services. Final design proposals cover the tunnels and approach highways and include an installation approach to minimise disruption. Maintaining the integrity of the fire fighting protection on this busy commuter route during the works is essential and passenger safety has been a major priority

For more information on companies in this article

Related Content

  • Automatic signal control to prevent emergency vehicle collisions?
    March 14, 2012
    Field trials under way in Arizona promise eradication of accidents between emergency vehicles at intersections – as part of a national focus on ‘intelligent signal’ infrastructure. Collisions between police cars, ambulances and fire crews as they reach intersections at the same time, with equal priority given by all signals set on red, are as serious as they sound absurd. For emergency teams and those in need of their help, the consequences are dire. The solution could come from application of connected veh
  • PB wins on-call contract for Detroit-Chicago high speed rail project
    August 3, 2012
    The Michigan Department of Transportation (MDoT) has awarded an on-call contract to Parsons Brinckerhoff for construction services in support of the agency’s efforts to implement accelerated rail services along a high-speed rail corridor between Pontiac/Detroit and Chicago.
  • Mobinet counters weighty cross border concerns
    November 9, 2017
    A Mobinet pilot is combining onboard weighing with V2X comms to streamline vehicle weight enforcement. David Crawford reports. Pan-European, cross-border weigh-in-motion (WIM) for trucks is now a practical possibility, following successful Scandinavian trials within the EU-co-funded Mobinet (Internet of Mobility) programme. New technology is using strain sensors, located on load-bearing components and routinely installed in truck fleet management systems.
  • Viaduct deck renewal creates detour dilemma for MassDOT
    May 26, 2016
    As the deck renewal of the I-91 viaduct in Springfield gets underway, David Crawford looks at the preparation and planning to ease the resulting traffic congestion. Accommodating the deck renewal of a 4km-long/four-lanes in each direction viaduct in the heart of Springfield (Massachusetts’ third largest city), has involved the state’s Department of Transportation (MassDOT) in a massive exercise in transport research and ITS-based area-wide preplanning and traffic management. Supporting a workzone of well ab