Skip to main content

Golden River Traffic renews contract for road traffic monitoring system

Golden River Traffic (GRT), part of the Clearview Traffic Group, has successfully renewed a long-term contract to maintain the road traffic monitoring system on the UK’s A1 Darrington to Dishforth DBFO project with Road Management Services (RMS). This contract win is initially for an eight year duration, with the option to extend for up to a further four years. The A1 Darrington to Dishforth DBFO project comprises improvements to and the operation and maintenance of 53kms of the A1(M) / A1(T) between Darrin
April 16, 2012 Read time: 2 mins
2057 Golden River Traffic (GRT), part of the 557 Clearview Traffic Group, has successfully renewed a long-term contract to maintain the road traffic monitoring system on the UK’s A1 Darrington to Dishforth DBFO project with Road Management Services (RMS). This contract win is initially for an eight year duration, with the option to extend for up to a further four years.

The A1 Darrington to Dishforth DBFO project comprises improvements to and the operation and maintenance of 53kms of the A1(M) / A1(T) between Darrington, south of the A1(M) / M62 interchange and the A1(M) / A168 interchange at Dishforth, east of Ripon. This DBFO forms a strategic link in the national network between Scotland, the north-east and the south of England.

Golden River Traffic will be maintaining 124 TME sites, made up of 40 count (camera) sites and 84 speed sites (configured with either eight or 16 loops).

Golden River Traffic has been maintaining this DBFO since 2004 and has recently been awarded the renewal of the contract for being both realistic in the maintenance of the DBFO project and delivering to the expected levels of data accuracy, reliability and outstanding past performance.

For more information on companies in this article

Related Content

  • Alstom to implement new Swedish railway traffic control centre
    October 1, 2015
    Swedish transport administration Trafikverket has awarded Alstom a contract worth US$73.5 million to implement the Iconis railway control centre solution. The new traffic management system will cover the entire country and forms part of a broader project by Trafikverket to improve the punctuality and capacity of its network. The scope of the contract, which will run for eight years with an additional nine-year option, also covers the development and maintenance of the system. Alstom’s Iconis Mainline con
  • M62 managed motorway scheme signs switched on
    February 12, 2013
    Work to upgrade part of the M62 in West Yorkshire to a managed motorway, the first scheme in the Yorkshire and Humber region, reached a significant milestone when the first overhead electronic signs went live. For the first time, the variable advisory speed limit signs have come into operation between junctions 27 and 28 to allow the UK Highways Agency to calibrate and test the technology required for the new managed motorway, with the signs being switched on and off in response to traffic conditions. Advis
  • Transport strategy must deliver fully, says FTA
    July 5, 2017
    UK transport trade body the Freight Transport Association (FTA) says the Government’s new transport investment plan is good news for the sector but more investment is needed to upgrade the road network.
  • Pioneering new passenger information systems
    February 3, 2012
    Chicago pioneers new passenger information initiatives. By David Crawford