Skip to main content

Golden River Traffic renews contract for road traffic monitoring system

Golden River Traffic (GRT), part of the Clearview Traffic Group, has successfully renewed a long-term contract to maintain the road traffic monitoring system on the UK’s A1 Darrington to Dishforth DBFO project with Road Management Services (RMS). This contract win is initially for an eight year duration, with the option to extend for up to a further four years. The A1 Darrington to Dishforth DBFO project comprises improvements to and the operation and maintenance of 53kms of the A1(M) / A1(T) between Darrin
April 16, 2012 Read time: 2 mins
2057 Golden River Traffic (GRT), part of the 557 Clearview Traffic Group, has successfully renewed a long-term contract to maintain the road traffic monitoring system on the UK’s A1 Darrington to Dishforth DBFO project with Road Management Services (RMS). This contract win is initially for an eight year duration, with the option to extend for up to a further four years.

The A1 Darrington to Dishforth DBFO project comprises improvements to and the operation and maintenance of 53kms of the A1(M) / A1(T) between Darrington, south of the A1(M) / M62 interchange and the A1(M) / A168 interchange at Dishforth, east of Ripon. This DBFO forms a strategic link in the national network between Scotland, the north-east and the south of England.

Golden River Traffic will be maintaining 124 TME sites, made up of 40 count (camera) sites and 84 speed sites (configured with either eight or 16 loops).

Golden River Traffic has been maintaining this DBFO since 2004 and has recently been awarded the renewal of the contract for being both realistic in the maintenance of the DBFO project and delivering to the expected levels of data accuracy, reliability and outstanding past performance.

For more information on companies in this article

Related Content

  • GPS delivers accurate journey time data for UTC
    January 27, 2012
    A new solution developed as a consequence of the UK's Freeflow project fuses GPS and UTC loop data to give more accurate predictions of journey times, benefting network managers and travellers alike. By Matt Cowley and Gareth Jones, Trakm8 and John Polak and Rajesh Krishnan, Imperial College London
  • Indra consortium awarded east-west Algeria highway contract
    June 17, 2014
    A consortium led by Codiser and including Indra has been awarded a contract to build facilities and provide equipment to operate a 380 kilometre stretch of the east-west Algerian highway. The contract, awarded by L’Algerienne de Gestion des Autoroutes (AGA), the organisation responsible for managing, operating, maintaining and servicing the Algerian national highway network, covers a stretch that links the cities of Hammam El Bibane and Bou Kadir, via the country's capital Algiers, in the central sectio
  • Project of the year award for Glenfield Junction Alliance
    May 9, 2014
    Australia’s Glenfield Junction Alliance has received the 2014 Railway Project of the Year Award by the Railway Technical Society of Australasia (RTSA) for its work on the Glenfield Junction project, which formed a critical part of the South West Rail Link Glenfield Transport Interchange project in New South Wales.
  • A9 average speed cameras improving road safety
    September 1, 2016
    The latest report by the A9 Safety Group on accident statistics on the A9 in Scotland indicate that there continues to be a sustained improvement in driver behaviour and a corresponding fall in collisions and casualties. The report contains collision and casualty data for the first 18 months of operation of the average speed cameras to 30 April 2016, which is the mid-point of the evaluation period. The other performance data covers the period to 30 June 2016 unless otherwise stated.