Skip to main content

Golden River Traffic renews contract for road traffic monitoring system

Golden River Traffic (GRT), part of the Clearview Traffic Group, has successfully renewed a long-term contract to maintain the road traffic monitoring system on the UK’s A1 Darrington to Dishforth DBFO project with Road Management Services (RMS). This contract win is initially for an eight year duration, with the option to extend for up to a further four years. The A1 Darrington to Dishforth DBFO project comprises improvements to and the operation and maintenance of 53kms of the A1(M) / A1(T) between Darrin
April 16, 2012 Read time: 2 mins
2057 Golden River Traffic (GRT), part of the 557 Clearview Traffic Group, has successfully renewed a long-term contract to maintain the road traffic monitoring system on the UK’s A1 Darrington to Dishforth DBFO project with Road Management Services (RMS). This contract win is initially for an eight year duration, with the option to extend for up to a further four years.

The A1 Darrington to Dishforth DBFO project comprises improvements to and the operation and maintenance of 53kms of the A1(M) / A1(T) between Darrington, south of the A1(M) / M62 interchange and the A1(M) / A168 interchange at Dishforth, east of Ripon. This DBFO forms a strategic link in the national network between Scotland, the north-east and the south of England.

Golden River Traffic will be maintaining 124 TME sites, made up of 40 count (camera) sites and 84 speed sites (configured with either eight or 16 loops).

Golden River Traffic has been maintaining this DBFO since 2004 and has recently been awarded the renewal of the contract for being both realistic in the maintenance of the DBFO project and delivering to the expected levels of data accuracy, reliability and outstanding past performance.

For more information on companies in this article

Related Content

  • Strabag consortium awarded Eisack River undercrossing contract
    October 24, 2014
    Construction group Strabag, in a consortium with the Italian construction companies Salini Impregilo, Consorzio Cooperative Costruzioni and Collini Lavori, has been awarded a US$379.5 million contract to build the Eisack Undercrossing section of the Brenner Base Tunnel. Work is scheduled to begin this year with a planned construction time of around eight years. The contract section is located at the southern end of the Brenner Base Tunnel near the town of Franzensfeste (Fortezza) in the Province of Bozen
  • EU mobility’s Covid escape route
    July 29, 2021
    European Union roads could be more resilient after the pandemic ends, thanks to the goal of creating a more integrated mobility network, says ERF’s José Diez
  • Growing ITS capability, a way to increase infrastructure capacity
    February 2, 2012
    Iteris's Greg McKhann makes the case for policymakers to look more seriously at the use of ITS as a means of increasing existing infrastructure capacity
  • Traffic Data Systems sets the standard
    April 16, 2024
    With various new loop-based traffic monitoring and classification systems, Traffic Data Systems (TDS) from Germany is once again setting new standards in this business field. All systems have been certified by the German Federal Highway Research Institute (BASt) with the highest achievable accuracy level (A1) and for up to 1,050m loop feed cable (twisted pair AWG20/0,5mm²).