Skip to main content

Golden River Traffic renews contract for road traffic monitoring system

Golden River Traffic (GRT), part of the Clearview Traffic Group, has successfully renewed a long-term contract to maintain the road traffic monitoring system on the UK’s A1 Darrington to Dishforth DBFO project with Road Management Services (RMS). This contract win is initially for an eight year duration, with the option to extend for up to a further four years. The A1 Darrington to Dishforth DBFO project comprises improvements to and the operation and maintenance of 53kms of the A1(M) / A1(T) between Darrin
April 16, 2012 Read time: 2 mins
2057 Golden River Traffic (GRT), part of the 557 Clearview Traffic Group, has successfully renewed a long-term contract to maintain the road traffic monitoring system on the UK’s A1 Darrington to Dishforth DBFO project with Road Management Services (RMS). This contract win is initially for an eight year duration, with the option to extend for up to a further four years.

The A1 Darrington to Dishforth DBFO project comprises improvements to and the operation and maintenance of 53kms of the A1(M) / A1(T) between Darrington, south of the A1(M) / M62 interchange and the A1(M) / A168 interchange at Dishforth, east of Ripon. This DBFO forms a strategic link in the national network between Scotland, the north-east and the south of England.

Golden River Traffic will be maintaining 124 TME sites, made up of 40 count (camera) sites and 84 speed sites (configured with either eight or 16 loops).

Golden River Traffic has been maintaining this DBFO since 2004 and has recently been awarded the renewal of the contract for being both realistic in the maintenance of the DBFO project and delivering to the expected levels of data accuracy, reliability and outstanding past performance.

For more information on companies in this article

Related Content

  • New South Wales removes speed cameras
    October 3, 2014
    New South Wales Minister for Roads and Freight, Duncan Gay, has announced that speed cameras in ten locations across NSW are to be removed as soon as any safety works such as additional signage, barriers and markings and that work has been finished. Gay said in a statement that the government is keeping to a statement that it made while in opposition, and removing any speed cameras that did not add a proven safety benefit. The 2014 Speed Camera Review of the state’s cameras indicates that early result
  • Integrated corridor management 'to enhance travel efficiency'
    August 29, 2012
    New systems of software are coming together to form the technological backbone of a project that will apply practically to one corridor in Dallas, but influence travel across a wider area. Dallas Area Rapid Transit (DART) is the lead agency for an extensive Integrated Corridor Management (ICM) project in Dallas, covering an area stretching north east of downtown Dallas, 20 miles long by two miles wide. The corridor is defined loosely by the US-75 freeway and DART’s light rail ‘red line’. These are the theor
  • ASECAP examines tolling’s trials, tribulations and triumphs
    September 4, 2018
    If you want to get up to speed on the main issues facing the transport sector and tolling companies, ASECAP Study Days event in Ljubljana was a good place to start. Colin Sowman reports (Photographs: Louis David). Increasing populations, ever-higher technical and safety requirements, and electric and hybrid vehicles will provide both challenges and opportunities for tolling companies. The annual Study Days event organised by ASECAP (the European association for tolling companies) examined all of these aspec
  • Acusensus phone-detection units arrive on English roads
    August 1, 2023
    Australian road safety company says trailer units will be positioned on selected highways