Skip to main content

Dynniq to deliver communications technology on South West motorway network

Highways England has awarded the South West region 4 year Construction Work Framework Lot 6 (Technology) to Dynniq, comprising Areas 1 and 2, the largest Highways England operating area covering 11 per cent of the strategic road, totalling 230 miles from Cheltenham to Penzance. The technology being installed covers the full range of field based solutions from Highways England’s portfolio including message signs, incident detection, CCTV, trunk road traffic signals, weather systems, emergency telephones, com
July 19, 2017 Read time: 1 min
8101 Highways England has awarded the South West region 4 year Construction Work Framework Lot 6 (Technology) to 8343 Dynniq, comprising Areas 1 and 2, the largest Highways England operating area covering 11 per cent of the strategic road, totalling 230 miles from Cheltenham to Penzance.


The technology being installed covers the full range of field based solutions from Highways England’s portfolio including message signs, incident detection, CCTV, trunk road traffic signals, weather systems, emergency telephones, communications and power.  The team will construct new sites, chambers and ducting; install and test the technology; handover to maintenance; and operate with a Principal Contractor team structure.

The framework is structured to enable the key delivery partners (across a combination of 12 separate Lots) to work together in developing schemes, providing infrastructure and commissioning technology, in a safe, efficient and cost effective manner.

Related Content

  • January 27, 2012
    Rapid growth of bus rapid transit schemes on US Pacific coast
    This section pulls together all the multi-modal topics in each issue. Subject matter will include smartcards; ticketing and payment systems; passenger information systems; fleet management for buses, trains and light rail; park and ride systems; on-line access to real-time information via Internet portals
  • October 22, 2014
    Using electricity to power road freight
    Next year sees the start of the first real-life electrified road system for transporting freight. Worldwide freight transportation is predicted to double by 2050 but despite expansion of global rail infrastructure only one third of this additional freight transport can be handled by trains. This means that the largest proportion of freight transport will continue to be by road and as a result, experts expect global CO2 emissions from road freight traffic to more than double by 2050.
  • April 8, 2014
    UK defaults to hard shoulder running to expand motorway capacity
    Hard shoulder running has become the UK’s default response to increasing motorway capacity as Colin Sowman reports. Facing a predicted 46% increase in traffic levels by 2040 and the current economic recovery leading to more people travelling to, from and for work leaves the UK government under short- and long-term pressure to increase the capacity on the main motorway network. Particular sections of motorways are already experiencing repeated, sometimes tidal, congestion and both tight Treasury limits and t
  • August 27, 2014
    Roads revolution adds 900 miles of extra capacity
    Road users in the UK will see around 900 extra lane miles of road capacity added to England’s strategic highway network by 2021, a third more than was provided in the previous decade. The boost is thanks to a huge US£39.7 billion investment, the biggest since the 1970s, which will see annual funding for enhancements to motorways and major A roads triple over the next six years. Investment includes more than US$15 billion on maintenance, US$10 billion of which will be spent on resurfacing 3,000 miles of t