Skip to main content

Dynniq to deliver communications technology on South West motorway network

Highways England has awarded the South West region 4 year Construction Work Framework Lot 6 (Technology) to Dynniq, comprising Areas 1 and 2, the largest Highways England operating area covering 11 per cent of the strategic road, totalling 230 miles from Cheltenham to Penzance. The technology being installed covers the full range of field based solutions from Highways England’s portfolio including message signs, incident detection, CCTV, trunk road traffic signals, weather systems, emergency telephones, com
July 19, 2017 Read time: 1 min
8101 Highways England has awarded the South West region 4 year Construction Work Framework Lot 6 (Technology) to 8343 Dynniq, comprising Areas 1 and 2, the largest Highways England operating area covering 11 per cent of the strategic road, totalling 230 miles from Cheltenham to Penzance.


The technology being installed covers the full range of field based solutions from Highways England’s portfolio including message signs, incident detection, CCTV, trunk road traffic signals, weather systems, emergency telephones, communications and power.  The team will construct new sites, chambers and ducting; install and test the technology; handover to maintenance; and operate with a Principal Contractor team structure.

The framework is structured to enable the key delivery partners (across a combination of 12 separate Lots) to work together in developing schemes, providing infrastructure and commissioning technology, in a safe, efficient and cost effective manner.

Related Content

  • March 27, 2015
    ORR launches consultation on monitoring strategic roads network
    The Office of Rail and Road (ORR) has launched a public consultation setting out its proposed approach to a new monitoring regime to track Highways England’s performance in delivering its major roads investment programme. The consultation also sets out ORR’s strategic objective on securing improved performance and value for money from the strategic road network, and explains how ORR will hold Highways England to account. ORR is seeking comments from all interested parties by 19 June 2015. Last year th
  • September 13, 2016
    UK city to upgrade traffic signals
    Dynniq has been awarded a five year contract to deliver the Traffic Signals Asset Renewal (TSAR) programme to upgrade existing traffic signals equipment across the UK City of York, which is looking to reduce its annual maintenance costs. Over five years, the programme will see Dynniq replace around sixty traffic signal junctions and crossings with completely new equipment to a newly developed standard York specification. These installations will utilise the latest traffic controllers from the Dynniq PTC
  • June 7, 2012
    Wireless technology aids workzone communications
    Need for a temporary communication fix during a construction project has led to rapid deployment of a permanent but simplistic wireless broadband network in Chandler, Arizona When a major construction project was expected to disrupt highway communications in the city of Chandler, Arizona, the city’s engineers went looking for a simple solution. They needed a way of maintaining data connections with three consecutive intersections along Arizona Avenue in Chandler while construction necessitated the severin
  • September 26, 2019
    Sign language reduces human error says Clearview
    Wrong-way warning systems and advanced queue detection can help to reduce human error. They can also cut road accidents – and therefore road deaths, says Clearview Intelligence Where were nearly 1,800 deaths on the UK’s roads in 2018 – an average of five people dying each day. The largest single cause of serious injury is crashes at junctions (accounting for 33% of incidents), while the largest single cause of death was run-off road crashes (30%) “With vehicles increasingly being designed with saf