Skip to main content

Dynniq to deliver communications technology on South West motorway network

Highways England has awarded the South West region 4 year Construction Work Framework Lot 6 (Technology) to Dynniq, comprising Areas 1 and 2, the largest Highways England operating area covering 11 per cent of the strategic road, totalling 230 miles from Cheltenham to Penzance. The technology being installed covers the full range of field based solutions from Highways England’s portfolio including message signs, incident detection, CCTV, trunk road traffic signals, weather systems, emergency telephones, com
July 19, 2017 Read time: 1 min
8101 Highways England has awarded the South West region 4 year Construction Work Framework Lot 6 (Technology) to 8343 Dynniq, comprising Areas 1 and 2, the largest Highways England operating area covering 11 per cent of the strategic road, totalling 230 miles from Cheltenham to Penzance.


The technology being installed covers the full range of field based solutions from Highways England’s portfolio including message signs, incident detection, CCTV, trunk road traffic signals, weather systems, emergency telephones, communications and power.  The team will construct new sites, chambers and ducting; install and test the technology; handover to maintenance; and operate with a Principal Contractor team structure.

The framework is structured to enable the key delivery partners (across a combination of 12 separate Lots) to work together in developing schemes, providing infrastructure and commissioning technology, in a safe, efficient and cost effective manner.

For more information on companies in this article

Related Content

  • Highways England pilots project to reduce congestion along M62
    November 13, 2017
    Highways England (HE) has begun piloting a £7 million ($9 million) project to reduce congestion at the Croft Interchange – where junction 21a of the M6 meets junction 10 of the M62, near Warrington, Cheshire. The project aims to provide drivers with smoother and more reliable journey times.
  • Indra to upgrade Algeria’s Bouïra tunnel
    September 2, 2015
    The National Road Agency of Algeria (ANA) has awarded a contract for the modernisation of the Bouïra tunnel to a consortium comprising of the state construction company Cosider TP and Indra. The contract, which is worth US$12.3 million to Indra, will run for 15 months. It will deliver an integrated management solution and intelligent traffic systems for the tunnel, which is located on the east-west highway and crosses the country from the border with Tunisia to the border with Morocco and sees the heavi
  • Essex Highways improves street lighting
    February 22, 2013
    Internet hosted street lighting software from Mayrise Systems is helping Essex Highways, a strategic partnership between the UK's Essex County Council and Ringway Jacobs, to ensure street lights are working, in order to maintain a safe environment for both road users and pedestrians. Mayrise for Street Lighting Online is core to all the activities carried out by the Essex highways street lighting team; it allows for the accurate capture of technical data in the field and delivers this information in an easy
  • Cost benefit: Toronto retimings tame traffic trauma
    July 11, 2018
    Canada’s largest city reckons that it is saving its taxpayers’ money simply by altering the way traffic lights work. David Crawford reviews Toronto’s ambitious plans to ease congestion. Toronto, Canada’s largest metropolis (and the fourth largest in North America), has saved its residents CAN$53 (US$42.4) for every CAN$1 (US$0.80) spent over a 2012-2016 traffic signal retiming programme, according to figures released by its Transportation Services Division. The programme covered 1,275 signals (the city’s to