Skip to main content

Citilog system deployed in Rio de Janeiro tunnel

Citilog has announced the installation of a MediaTunnel system for the Rebouças tunnel in Brazil in partnership with its local value added reseller Engebras.
January 27, 2012 Read time: 1 min

371 Citilog has announced the installation of a MediaTunnel system for the Rebouças tunnel in Brazil in partnership with its local value added reseller 1805 Engebras. Located above the Corcovado, this tunnel is one of the biggest in Rio de Janeiro, has 50 IP cameras connected using RTSP protocol with high quality streams. This system features Citilog’s latest developments including redundant server and hot spare analyser for maximum reliability. In case of any component failure, hot redundancy enables operation to continue while maintenance replaces hardware. Citilog says the hot-spare solution is very cost-effective because it allows a full redundancy without doubling the amount of equipment.

The system detects critical incidents such as stopped vehicles, pedestrians and wrong way drivers, and will help CET-Rio de Janeiro Companhia de Engenharia e Tráfego (Traffic Engineering Department) security team to visualize and quickly solve traffic issues.

For more information on companies in this article

Related Content

  • Nairobi looks to ITS to ease travel problems
    March 6, 2018
    Shem Oirere looks at plans to tackle chronic congestion in the Kenyan capital - where commuters can typically expect it to take up to two hours to complete a 15km journey. Traffic jams in the Kenyan capital, Nairobi, are estimated to cost the country $360 million a year in terms of lost man-hours, fuel and pollution. According to Wilfred Oginga, an engineer with the Kenya Urban Roads Authority (KURA), the congestion has been exacerbated by poor regulation and enforcement of traffic rules, absence of
  • Nairobi looks to ITS to ease travel problems
    March 6, 2018
    Shem Oirere looks at plans to tackle chronic congestion in the Kenyan capital - where commuters can typically expect it to take up to two hours to complete a 15km journey. Traffic jams in the Kenyan capital, Nairobi, are estimated to cost the country $360 million a year in terms of lost man-hours, fuel and pollution. According to Wilfred Oginga, an engineer with the Kenya Urban Roads Authority (KURA), the congestion has been exacerbated by poor regulation and enforcement of traffic rules, absence of
  • Nairobi looks to ITS to ease travel problems
    March 6, 2018
    Shem Oirere looks at plans to tackle chronic congestion in the Kenyan capital - where commuters can typically expect it to take up to two hours to complete a 15km journey. Traffic jams in the Kenyan capital, Nairobi, are estimated to cost the country $360 million a year in terms of lost man-hours, fuel and pollution. According to Wilfred Oginga, an engineer with the Kenya Urban Roads Authority (KURA), the congestion has been exacerbated by poor regulation and enforcement of traffic rules, absence of
  • Virginia presses ahead with tunnels upgrade despite tolls challenge
    July 30, 2013
    David Crawford reviews current developments and legal/financial issues facing tunnel management in Virginia. This autumn the Virginia Department of Transportation (VDOT) in the US will defend its plan to introduce tolling on the Elizabeth River tunnels linking the cities of Norfolk and Portsmouth in the State’s Hampton Roads area. The tolling, which is due to start from February 2014, will be examined by the State’s Supreme Court later this year. The anticipated toll income, along with loans and bonds, is