Skip to main content

Electreon completes first US dynamic charging project

Testing of inductive charging technology along the Detroit road will start next year
By David Arminas December 8, 2023 Read time: 3 mins
Detroit is site of first wireless EV charging road in US (© Alexey Stiop | Dreamstime.com)

Electreon reports that its wireless EV charging road in Detroit – the first such public “station” in the US - has been completed as a testbed.

The technology enables EVs to charge while driving, using chargers that are embedded in the pavement. Detroit’s 14th Street is now equipped with inductive-charging coils between Marantette Street and Dalzelle Street that will charge vehicles equipped with Electreon receivers as they drive along.

The road will be used to test and perfect the wireless-charging technology ahead of making it available to the public in the next few years.

Extensive testing of the inductive charging technology will start early next year using a Ford E-Transit electric commercial van provided by vehicle manufacturer Ford and equipped with an Electreon receiver. Staff will test the efficiency and operation of the vehicle and study potential long-term public transportation opportunities.

Electreon’s wireless charging technology is based on inductive coupling between copper coils installed below the road surface and receivers installed on electric vehicles. When a vehicle with a receiver nears the in-road charging segments, the road transfers electricity wirelessly through a magnetic field. This electricity is then transferred as energy to the vehicle’s battery.

These charging segments can transfer wireless electricity to the receiver either when the vehicle is parked (static charging) or is driving (dynamic charging).

The electric road is safe for drivers, pedestrians and wildlife because each coil in the road is activated only when a vehicle with an approved receiver passes over it. This ensures that energy transfer is controlled and provided only to vehicles that require it.

Michigan Department of Transportation and Electreon have entered into a five-year commitment to develop the electric road system by piloting the technology on the US state’s roads. Also next year, the DoT will seek bids to rebuild part of US-12, called Michigan Avenue, which will see additional inductive charging installed. Electreon has also installed two static inductive charging stations in front of Michigan Central Station, which will be able to charge Electreon-equipped vehicles while they are parked.


The electric road is safe for drivers, pedestrians and wildlife because each coil in the road is activated only when a vehicle with an approved receiver passes over it (image: Electreon)



“Michigan has always been at the forefront of innovation in mobility and that forward thinking is on display with the latest advances in inductive charging from Electreon, the first deployment of this electric vehicle charging technology in the US,” said Justine Johnson, chief mobility officer of the Office of Future Mobility and Electrification (OFME).

“This latest milestone supports the goals of the MI Future Mobility Plan to grow Michigan’s mobility leadership and proves that companies like Electreon can test and deploy the newest innovations right here in Michigan.”

Since the OFME was formed in 2020, it has facilitated more than $485m in mobility-focused revenue and initiated $163.5m in follow-on funding for local companies. It works across state government, academia and private industry to develop Michigan’s mobility ecosystem, including the start-up and scale-up of emerging technologies and businesses.

For instance, OFME launched the first state strategy for future mobility, the MI Future Mobility Plan, and custom-built the first roads in the US for driverless vehicles.

Electreon develops and provides wireless charging solutions for EVs for shared public and commercial fleet operators. The company’s proprietary inductive technology charges EVs quickly and safely both while driving and parked. Electreon collaborates with cities and fleet operators on a sale business model and on a Charging as a Service (CaaS) business model, that enables cost-effective electrification of public, commercial, and autonomous fleets for smooth and continuous operation.

Electreon operates 18 projects across eight countries, together with more than 100 partners.

Related Content

  • Uber clean-up - those all-important facts and figures
    September 11, 2020
    Ride-hailing giant says it can switch to all-electric vehicles 'in any major city' by 2030
  • Full electric vehicle shipments to exceed 2 million by 2020
    October 11, 2013
    According to ABI Research, the number of full electric vehicles (EV) shipping yearly will increase from 150,000 in 2013 to 2.36 million in 2020, representing a CAGR of 48 per cent. Asia-Pacific will exhibit the strongest growth, driven by mounting pollution issues in its many megacities; however, true mass-market uptake will only start happening in the next decade.
  • Study reveals benefits of electric Beijing taxi fleet
    August 6, 2013
    The impact of introducing plug-in electric vehicles to the streets of Beijing, one of the world’s most polluted cities, has been examined by researchers from the University of Michigan in the ACS journal Environmental Science and Technology. They use big data mining techniques to understand the impact of fleet electrification. As part of the study, the researchers highlight that while plug-in electric vehicles have developed rapidly in recent years there are still uncertainties with regard to market accepta
  • Aimsun assesses Spain V2X impact
    June 21, 2022
    An Aimsun project with C-Roads Spain to assess the impact of Day 1 V2X services has been completed: Aimsun senior transportation modeller Laura Torres explains some of the results