Skip to main content

Work starts on more UK smart motorways

Three new major motorway schemes on the M1 and M3 will cut congestion and give Britain's drivers smoother, quicker journeys, Transport Secretary Patrick McLoughlin has announced. Construction will now start on the M1 junctions 28-31 in Derbyshire, M1 junctions 32-35a in South Yorkshire and on the M3 at junction 2-4a in Surrey. The new schemes are central to the Government's long term economic plan and part of US$41 billion of investment in the road network by 2021, which will see spending tripled to U
July 9, 2014 Read time: 3 mins
Three new major motorway schemes on the M1 and M3 will cut congestion and give Britain's drivers smoother, quicker journeys, Transport Secretary Patrick McLoughlin has announced.

Construction will now start on the M1 junctions 28-31 in Derbyshire, M1 junctions 32-35a in South Yorkshire and on the M3 at junction 2-4a in Surrey.

The new schemes are central to the Government's long term economic plan and part of US$41 billion of investment in the road network by 2021, which will see spending tripled to US$5 billion each year on England's key highways and motorways.

Smart motorways convert the hard shoulder to a running lane to boost capacity and smooth traffic, operating either permanently or during busy periods. Overhead variable message signs inform motorists of changes in speed limits, queuing and lane closures, while staff in regional control centres use CCTV to monitor incidents.

These schemes will boost capacity by a third and improve journey times up to 10 per cent through the M1 schemes and 15 per cent on the M3, where average speeds are currently 45mph during rush-hour. The national speed limit on these sections will remain at 70 mph.

The 503 Highways Agency previously consulted on proposals to limit speeds to 60mph between 7am and 7pm seven days a week because of the potential effect of the new schemes on local air quality.

However, the Transport Secretary has rejected this approach as the Government's preferred option for managing the problem and has instead asked the Highways Agency to rigorously investigate alternatives as work progresses on the schemes in the next 12-18 months. If any proposals continue to include varying speed limits, they must only apply when absolutely necessary. In particular, the Agency must look for alternatives that maintain the 70mph limit wherever possible, particularly when traffic tends to be lighter, such as at weekends and outside of peak commuting hours.

In the meantime, as with all smart motorways already in successful operation, the Highways Agency will take the necessary legal powers to enable them to vary the speed limit from the routine 70mph at certain times.

McLoughlin said: "Let me be absolutely clear, I want all motorways to run at 70mph. While it sometimes makes sense to use variable limits to keep people moving, blanket reductions are not acceptable. Smart motorways are an effective and cost efficient way of increasing space on our roads, cutting jams and speeding up journey times and I am pleased to announce the start of work on these schemes."

For more information on companies in this article

Related Content

  • Technology solution needed to counter mobile phone menace
    March 29, 2017
    With the UK set to increase the penalties for using mobile phones while driving, the RAC Foundation’s Steve Gooding considers what else can be done to combat this deadly distraction. The first mobile phone call was made in 1973, by an engineer working for Motorola. Today 4.7 billion people across the globe subscribe to a mobile service.
  • T-Charge introduced to older vehicles in London to tackle toxic air pollution
    October 23, 2017
    To combat thousands of premature deaths caused by air pollution in London, up to 34, 000 polluting vehicles travelling into Central London every month may have to pay the T-Charge £10.00 ($13.00) which will operate on top of the Congestion Charge £11.50 ($15.00). Launched by the Mayor of London Sadiq Khan, the T -Charge applies to drivers of pre-Euro 4 vehicles that do not meet the PM and NOx emissions and has come into effect from 7.00am on 23 October 2017.
  • Mott MacDonald Grontmij JV wins Highways Agency’s framework contract
    November 20, 2014
    The Mott MacDonald Grontmij joint venture (MMG JV) is to provide professional engineering design services to support strategic investment in England’s road network. The JV has been appointed on Lot 1 of the Highways Agency’s new US$7.8 billion Collaborative Delivery Framework (CDF), the country’s largest ever framework for the improvement of motorways and major A roads. The Highways Agency’s CDF is Collaborative working practices and knowledge sharing between designers, the Highways Agency, delivery part
  • Driver with 51 penalty points still allowed to drive
    January 12, 2016
    Three drivers with more than 40 points on their driving licences are still allowed on the road, according to a Freedom of Information request to the DVLA by the Institute of Advanced Motorists (IAM). The enquiry also found that 13 people in Britain currently have 28 or more points on their driving licence, the worst of those amassing 51 points. In addition, the numbers of drivers with 12 or more points has gone up by nine per cent in just seven months between March and October 2015 – from 6,884 to 7,517.