Skip to main content

Work starts on more UK smart motorways

Three new major motorway schemes on the M1 and M3 will cut congestion and give Britain's drivers smoother, quicker journeys, Transport Secretary Patrick McLoughlin has announced. Construction will now start on the M1 junctions 28-31 in Derbyshire, M1 junctions 32-35a in South Yorkshire and on the M3 at junction 2-4a in Surrey. The new schemes are central to the Government's long term economic plan and part of US$41 billion of investment in the road network by 2021, which will see spending tripled to U
July 9, 2014 Read time: 3 mins
Three new major motorway schemes on the M1 and M3 will cut congestion and give Britain's drivers smoother, quicker journeys, Transport Secretary Patrick McLoughlin has announced.

Construction will now start on the M1 junctions 28-31 in Derbyshire, M1 junctions 32-35a in South Yorkshire and on the M3 at junction 2-4a in Surrey.

The new schemes are central to the Government's long term economic plan and part of US$41 billion of investment in the road network by 2021, which will see spending tripled to US$5 billion each year on England's key highways and motorways.

Smart motorways convert the hard shoulder to a running lane to boost capacity and smooth traffic, operating either permanently or during busy periods. Overhead variable message signs inform motorists of changes in speed limits, queuing and lane closures, while staff in regional control centres use CCTV to monitor incidents.

These schemes will boost capacity by a third and improve journey times up to 10 per cent through the M1 schemes and 15 per cent on the M3, where average speeds are currently 45mph during rush-hour. The national speed limit on these sections will remain at 70 mph.

The 503 Highways Agency previously consulted on proposals to limit speeds to 60mph between 7am and 7pm seven days a week because of the potential effect of the new schemes on local air quality.

However, the Transport Secretary has rejected this approach as the Government's preferred option for managing the problem and has instead asked the Highways Agency to rigorously investigate alternatives as work progresses on the schemes in the next 12-18 months. If any proposals continue to include varying speed limits, they must only apply when absolutely necessary. In particular, the Agency must look for alternatives that maintain the 70mph limit wherever possible, particularly when traffic tends to be lighter, such as at weekends and outside of peak commuting hours.

In the meantime, as with all smart motorways already in successful operation, the Highways Agency will take the necessary legal powers to enable them to vary the speed limit from the routine 70mph at certain times.

McLoughlin said: "Let me be absolutely clear, I want all motorways to run at 70mph. While it sometimes makes sense to use variable limits to keep people moving, blanket reductions are not acceptable. Smart motorways are an effective and cost efficient way of increasing space on our roads, cutting jams and speeding up journey times and I am pleased to announce the start of work on these schemes."

Related Content

  • October 30, 2014
    UK’s M3 gets smart
    Work begins shortly on the initial phase of a US$278 million project to improve the M3 between the M25 and Farnborough. The section between junctions 2 and 4a will become a smart motorway, adding a fourth lane in both directions in place of the hard shoulder and adding enhanced on-road technology to keep traffic moving safely and reliably, providing a boost for businesses and the wider economy. The road will also be resurfaced with a new, low noise material. The main works are due to be completed by the
  • April 14, 2015
    IAM calls for greater education for smart motorway users
    As smart motorways reach their first birthday in the UK this week, the Institute of Advanced Motorists (IAM) has expressed concern that widespread confusion still exists amongst motorway users on how best to use them. Smart motorways were officially introduced this time last year to replace Managed Motorways as the solution to the nation’s congested motorways but concerns have been raised over their safety. England’s first all-lane running motorway, i.e. without a hard shoulder, opened on the 2.5 km
  • May 22, 2014
    ‘Risky tailgating and speeding rife on UK motorways’
    Six in ten UK drivers own up to risky tailgating (57 per cent) and a similar proportion break the limit by 10mph or more (60 per cent) on motorways and 70mph dual carriageways, with men by far the worst offenders, a survey by Brake and insurance company Direct Line reveals. Almost all drivers say they worry about other drivers tailgating on motorways: 95 per cent are at least occasionally concerned about vehicles too close behind them; more than four in ten (44 per cent) are concerned every, or most, tim
  • July 17, 2013
    Government to reform strategic road network in England
    The national network of motorways and trunk roads in England will get extra lanes, smoother, quieter surfaces, improved junctions and new sections in key areas under a plan launched this week by Transport Secretary Patrick McLoughlin. £28 (US$42.5) billion of investment, which includes a trebling of funding for motorways and major A-roads, will lead to the biggest ever upgrade of the existing network. The focus will be on cutting congestion and minimising the environmental impact of roads, including an extr