Skip to main content

Work starts on more UK smart motorways

Three new major motorway schemes on the M1 and M3 will cut congestion and give Britain's drivers smoother, quicker journeys, Transport Secretary Patrick McLoughlin has announced. Construction will now start on the M1 junctions 28-31 in Derbyshire, M1 junctions 32-35a in South Yorkshire and on the M3 at junction 2-4a in Surrey. The new schemes are central to the Government's long term economic plan and part of US$41 billion of investment in the road network by 2021, which will see spending tripled to U
July 9, 2014 Read time: 3 mins
Three new major motorway schemes on the M1 and M3 will cut congestion and give Britain's drivers smoother, quicker journeys, Transport Secretary Patrick McLoughlin has announced.

Construction will now start on the M1 junctions 28-31 in Derbyshire, M1 junctions 32-35a in South Yorkshire and on the M3 at junction 2-4a in Surrey.

The new schemes are central to the Government's long term economic plan and part of US$41 billion of investment in the road network by 2021, which will see spending tripled to US$5 billion each year on England's key highways and motorways.

Smart motorways convert the hard shoulder to a running lane to boost capacity and smooth traffic, operating either permanently or during busy periods. Overhead variable message signs inform motorists of changes in speed limits, queuing and lane closures, while staff in regional control centres use CCTV to monitor incidents.

These schemes will boost capacity by a third and improve journey times up to 10 per cent through the M1 schemes and 15 per cent on the M3, where average speeds are currently 45mph during rush-hour. The national speed limit on these sections will remain at 70 mph.

The 503 Highways Agency previously consulted on proposals to limit speeds to 60mph between 7am and 7pm seven days a week because of the potential effect of the new schemes on local air quality.

However, the Transport Secretary has rejected this approach as the Government's preferred option for managing the problem and has instead asked the Highways Agency to rigorously investigate alternatives as work progresses on the schemes in the next 12-18 months. If any proposals continue to include varying speed limits, they must only apply when absolutely necessary. In particular, the Agency must look for alternatives that maintain the 70mph limit wherever possible, particularly when traffic tends to be lighter, such as at weekends and outside of peak commuting hours.

In the meantime, as with all smart motorways already in successful operation, the Highways Agency will take the necessary legal powers to enable them to vary the speed limit from the routine 70mph at certain times.

McLoughlin said: "Let me be absolutely clear, I want all motorways to run at 70mph. While it sometimes makes sense to use variable limits to keep people moving, blanket reductions are not acceptable. Smart motorways are an effective and cost efficient way of increasing space on our roads, cutting jams and speeding up journey times and I am pleased to announce the start of work on these schemes."

For more information on companies in this article

Related Content

  • Changing driving conditions need ongoing driver training
    January 23, 2012
    Trevor Ellis, chairman of the ITS UK Enforcement Interest Group, considers the role of ongoing driver training in increasing compliance. It is over 30 years since I passed my driving test. The world was quite a different place then, in that there were only half the vehicles there are now on the UK's roads, mobile phones did not really exist and (in the UK at least) the vast majority of us drove cars which by today's standards exhibited dreadful dynamic stability and were woefully underpowered.
  • Highways Agency launches A14 consultation
    April 9, 2014
    As a result of the public consultation to consider route options for the A14 Cambridge to Huntingdon improvement scheme, the proposed scheme has been developed in more detail and plans to toll the road have been dropped. Changes that have been made in response to feedback from last year’s consultation include improvements to four junctions on the route and an updated local access road been proposed between two villages. The Highways Agency has now launched a ten-week consultation period, which forms par
  • Trans-Pennine road tunnel routes shortlisted, may include special lighting, caverns
    August 19, 2016
    Five routes have been shortlisted for the Trans-Pennine tunnel – the most ambitious road scheme undertaken in the UK in more than five decades. The Trans-Pennine tunnel study was launched by the government in autumn 2015, one of a number of studies aimed at addressing some of the biggest challenges facing the road network in the UK. The latest interim study shows the continued strong case for the tunnel which could provide safer, faster and more reliable journeys for motorists. All five routes join th
  • A new era for England’s major roads
    March 26, 2015
    Highways England, the government-owned company which will deliver the largest investment in England’s major roads in a generation, officially launches next week. The company, which replaces the Highways Agency from 1 April, will invest US$16 billion in delivering a raft of improvements on England’s motorways and major A roads making roads even safer, improving traffic flow and reducing congestion. The improvements over the first five years of operation include: 112 major improvements, including 15 sma