Skip to main content

Work starts on more UK smart motorways

Three new major motorway schemes on the M1 and M3 will cut congestion and give Britain's drivers smoother, quicker journeys, Transport Secretary Patrick McLoughlin has announced. Construction will now start on the M1 junctions 28-31 in Derbyshire, M1 junctions 32-35a in South Yorkshire and on the M3 at junction 2-4a in Surrey. The new schemes are central to the Government's long term economic plan and part of US$41 billion of investment in the road network by 2021, which will see spending tripled to U
July 9, 2014 Read time: 3 mins
Three new major motorway schemes on the M1 and M3 will cut congestion and give Britain's drivers smoother, quicker journeys, Transport Secretary Patrick McLoughlin has announced.

Construction will now start on the M1 junctions 28-31 in Derbyshire, M1 junctions 32-35a in South Yorkshire and on the M3 at junction 2-4a in Surrey.

The new schemes are central to the Government's long term economic plan and part of US$41 billion of investment in the road network by 2021, which will see spending tripled to US$5 billion each year on England's key highways and motorways.

Smart motorways convert the hard shoulder to a running lane to boost capacity and smooth traffic, operating either permanently or during busy periods. Overhead variable message signs inform motorists of changes in speed limits, queuing and lane closures, while staff in regional control centres use CCTV to monitor incidents.

These schemes will boost capacity by a third and improve journey times up to 10 per cent through the M1 schemes and 15 per cent on the M3, where average speeds are currently 45mph during rush-hour. The national speed limit on these sections will remain at 70 mph.

The 503 Highways Agency previously consulted on proposals to limit speeds to 60mph between 7am and 7pm seven days a week because of the potential effect of the new schemes on local air quality.

However, the Transport Secretary has rejected this approach as the Government's preferred option for managing the problem and has instead asked the Highways Agency to rigorously investigate alternatives as work progresses on the schemes in the next 12-18 months. If any proposals continue to include varying speed limits, they must only apply when absolutely necessary. In particular, the Agency must look for alternatives that maintain the 70mph limit wherever possible, particularly when traffic tends to be lighter, such as at weekends and outside of peak commuting hours.

In the meantime, as with all smart motorways already in successful operation, the Highways Agency will take the necessary legal powers to enable them to vary the speed limit from the routine 70mph at certain times.

McLoughlin said: "Let me be absolutely clear, I want all motorways to run at 70mph. While it sometimes makes sense to use variable limits to keep people moving, blanket reductions are not acceptable. Smart motorways are an effective and cost efficient way of increasing space on our roads, cutting jams and speeding up journey times and I am pleased to announce the start of work on these schemes."

For more information on companies in this article

Related Content

  • Confusion over electric motors for heavy trucks
    December 19, 2016
    According to Dr Peter Harrop of research company IDTechEx, there is still no agreement on the best type of electric motor to use in heavy trucks. The company’s analysis indicates that the booming, confusing traction motor business will rise to around US$400 billion in 2027. Its new report, Electric Motors for Electric Vehicles 2017-2027 navigates the jargon, the design options and the disagreements. The changing needs and evolving technology are matched to create forecasts and technology timelines based
  • Small toll agency adopts big city thinking
    December 5, 2014
    Andrew Bardin Williams looks at a novel option for new toll road authorities. While somewhat politically controversial, outsourcing has gained traction in the business world as a model worth investigating for its efficiency and cost saving benefits. Lean start-ups tend to employ independent contractors instead of full-time employees in an effort to remain flexible and avoid costs associated with pensions, retirement places, health insurance, office space and benefit packages.
  • New Zealand’s first weather-activated road signs go live
    November 3, 2015
    New Zealand’s first weather-activated road signs with adjustable speed limits have gone live on State Highway 29 over the Kaimai Range. The 22 high-tech signs are part of an innovative NZ Transport Agency trial that aims to reduce the crash rate on the steep road, which links the Waikato and the Bay of Plenty. The variable speed signs, along with four web cameras, will be linked to a weather station at the summit of the Kaimai Range. The Transport Agency will monitor the weather station and adjust the
  • Electronic toll collection delivers efficient traffic regulation
    February 3, 2012
    Electronic tolling systems have been in use for decades now. Worldwide, steadily more and more tolling systems are being set into operation, providing efficient means for traffic regulation and financing of infrastructure. But despite this maturity enforcement is still not being given the consideration it deserves. Q-Free's Steinar Furan writes