Skip to main content

Siemens to equip Hong Kong's longest road tunnel

Siemens is to supply all the traffic control and monitoring systems for the twin-bore Liantang tunnel, which will link Hong Kong to the new Liantang/Heung Yuen Wai border crossing with mainland China. The five kilometre long tunnel forms part of a four-lane freeway link, extending to around eleven kilometres in total, and is intended to provide a direct connection for cross-border freight and passenger vehicle traffic between the Northeast New Territories and the Eastern part of Shenzhen on the Chinese
July 8, 2016 Read time: 2 mins
189 Siemens is to supply all the traffic control and monitoring systems for the twin-bore Liantang tunnel, which will link Hong Kong to the new Liantang/Heung Yuen Wai border crossing with mainland China.

The five kilometre long tunnel forms part of a four-lane freeway link, extending to around eleven kilometres in total, and is intended to provide a direct connection for cross-border freight and passenger vehicle traffic between the Northeast New Territories and the Eastern part of Shenzhen on the Chinese mainland. The project will become the longest road tunnel in Hong Kong on completion in 2022.

Siemens will supply its technology for the International Tunnel Control Centre (ITCC), which will use Simatic WinCC open architecture for the operations control system. The ITCC will draw on real-time data to assess conditions in the tunnel and decide on actions to optimise traffic flow, taking safety aspects into account. Automated incident and congestion detection, emergency management for accidents, tunnel closure and contraflow management are just some of the main functions provided by the ITCC.

Related Content

  • October 26, 2016
    Speeding ambulances through borders
    David Crawford sees hope for stricken patients on the wrong side of the border. In treating patients with heart or stroke conditions, speed is of the essence.
  • September 17, 2014
    Indra to modernise London’s Tunnels Control Centre
    Transport for London (TfL) has appointed Indra to modernise the technology for the control and operation of the 12 road tunnels in London and 90 kilometres of approach roads.
  • September 17, 2014
    Indra to modernise London’s Tunnels Control Centre
    Transport for London (TfL) has appointed Indra to modernise the technology for the control and operation of the 12 road tunnels in London and 90 kilometres of approach roads.
  • August 29, 2012
    Integrated corridor management 'to enhance travel efficiency'
    New systems of software are coming together to form the technological backbone of a project that will apply practically to one corridor in Dallas, but influence travel across a wider area. Dallas Area Rapid Transit (DART) is the lead agency for an extensive Integrated Corridor Management (ICM) project in Dallas, covering an area stretching north east of downtown Dallas, 20 miles long by two miles wide. The corridor is defined loosely by the US-75 freeway and DART’s light rail ‘red line’. These are the theor