Skip to main content

Siemens to equip Hong Kong's longest road tunnel

Siemens is to supply all the traffic control and monitoring systems for the twin-bore Liantang tunnel, which will link Hong Kong to the new Liantang/Heung Yuen Wai border crossing with mainland China. The five kilometre long tunnel forms part of a four-lane freeway link, extending to around eleven kilometres in total, and is intended to provide a direct connection for cross-border freight and passenger vehicle traffic between the Northeast New Territories and the Eastern part of Shenzhen on the Chinese
July 8, 2016 Read time: 2 mins
189 Siemens is to supply all the traffic control and monitoring systems for the twin-bore Liantang tunnel, which will link Hong Kong to the new Liantang/Heung Yuen Wai border crossing with mainland China.

The five kilometre long tunnel forms part of a four-lane freeway link, extending to around eleven kilometres in total, and is intended to provide a direct connection for cross-border freight and passenger vehicle traffic between the Northeast New Territories and the Eastern part of Shenzhen on the Chinese mainland. The project will become the longest road tunnel in Hong Kong on completion in 2022.

Siemens will supply its technology for the International Tunnel Control Centre (ITCC), which will use Simatic WinCC open architecture for the operations control system. The ITCC will draw on real-time data to assess conditions in the tunnel and decide on actions to optimise traffic flow, taking safety aspects into account. Automated incident and congestion detection, emergency management for accidents, tunnel closure and contraflow management are just some of the main functions provided by the ITCC.

For more information on companies in this article

Related Content

  • Clearview Traffic shortlisted for two Highways Excellence Awards
    September 28, 2012
    Clearview Traffic Group has been shortlisted in two different categories for the Highways Magazine Excellence Awards 2012, with two diverse road delineation projects. In the Road Marking Project of the Year category, the company has been chosen as a finalist for its dynamic delineation project for the Hindhead Tunnel in Surrey, UK, where Clearview installed 868 Astucia IRS2 hardwired bi-directional road studs in a project initiated by the Highways Agency (HA) in 2007 to remove a major source of congestion a
  • Success of London’s congestion charge scheme
    February 15, 2013
    Said to be the biggest congestion charge scheme to launch in any city, the London scheme got off to a smooth start ten years ago on 17 February 2003, much to the surprise of London's then mayor Ken Livingstone, who ten years later says “it turned out better than I expected.” None of the anticipated pre-7am congestion as drivers attempted to avoid the charge happened, and by the end of the first day 57,000 drivers had paid it. The main problem seemed to be that buses were all running ahead of time and had t
  • Machine vision’s transport offerings move on apace
    June 30, 2016
    Colin Sowman considers some of the latest advances in camera technology and transport-related vision technology applications. Vision technology in the transportation sector is moving apace as technical developments on both the hardware and software sides combine to make cameras more multifunctional with a single digital camera now able to cover a multitude of tasks.
  • AMG transmission system used in Blackwall Tunnel refurbishment
    May 18, 2012
    AMG Systems has announced it has been selected to supply the transmission solution for the refurbished Victorian-built Blackwall Tunnel under the river Thames in London. The three-year refurbishment programme, costing over US$113 million, is being undertaken by Transport for London (TfL) to bring the tunnel up to European safety regulations. P. Ducker Systems (PDS) is undertaking the task of supplying the tunnel systems for the project.