Skip to main content

NJDOT traffic signal coordination project begins

The New Jersey Department of Transportation (NJDOT) has started work on a much-needed congestion relief project, using technology to improve traffic flow along a thirteen mile stretch of Route 22 in Somerset and Union counties. The US$7.77 million project will improve mobility along the entire corridor through the creation of an integrated system interconnecting eighteen traffic signals into one controlled traffic signal system (CTSS). This includes the complete replacement of the existing traffic signal sy
April 8, 2013 Read time: 2 mins
The 7104 New Jersey Department of Transportation (NJDOT) has started work on a much-needed congestion relief project, using technology to improve traffic flow along a thirteen mile stretch of Route 22 in Somerset and Union counties.

The US$7.77 million project will improve mobility along the entire corridor through the creation of an integrated system interconnecting eighteen traffic signals into one controlled traffic signal system (CTSS). This includes the complete replacement of the existing traffic signal systems at five intersections and geometric improvements and signal modifications to seven other intersections.

The project also includes the installation of eight new traffic cameras for the camera surveillance system (CSS), two new permanent electronic dynamic message signs, and fibre optic and wireless communication connecting the new integrated system to the statewide traffic management centre (STMC).

As most of the improvements require the installation of electronic equipment outside the Route 22 mainline travel lanes, work will be performed during normal business hours with minimal disruption to traffic.

For more information on companies in this article

Related Content

  • Developments in travel information display systems
    August 1, 2012
    David Crawford looks at recent developments in travel information display systems. It is important to remember that we are investing in Real-Time Passenger Information [RTPI] to increase ridership," says Robert Burke, Managing Director of New Zealand transit tracking technology specialist Connexionz, which has been involved in at-stop and remote passenger information since 1995. "Superior information improves the perception of public transport reliability and gives the passenger more choices and greater con
  • Construction begins on $1 billion I-95 Express Lanes in Northern Virginia
    August 8, 2012
    Surrounded by elected officials, transportation engineers, and dignitaries, Virginia Governor Bob McDonnell held a groundbreaking ceremony yesterday to begin construction of the I-95 Express Lanes in Northern Virginia. The project will build 29 miles (46.7kms) of express lanes on I-95 from Garrisonville Road in Stafford County to Edsall Road in Fairfax County, and will connect the I-95 Express Lanes to the I-495 Express Lanes currently under construction to provide a seamless network of new lanes to reduce
  • TransCore to upgrade over 300 toll lanes in central Florida
    October 14, 2015
    The Central Florida Expressway Authority (CFX) has awarded TransCore a US$85 million project to design, install and maintain a new, innovative electronic toll collection system for over 300 toll lanes, as part of an ongoing initiative to improve its transportation management system. TransCore will upgrade the system with its Infinity Digital Lane System, which consists of independent modules that can be easily replaced, upgraded or removed in the field without affecting lane operations, reducing long-ter
  • Toll plaza conversion will reduce congestion on I-95
    April 17, 2012
    In an effort to reduce congestion in a busy corridor for motorists and commercial freight carriers, Delaware Department of Transportation (DelDOT) appointed TransCore as the lead integrator on a project to convert the Newark Toll Plaza on I-95, adding two new electronic highway speed lanes on both the north and south bound plazas. Plaza throughput is now about to jump from 250-300 transactions per lane per hour to an estimated 2,000. The US$32 million “shovel ready” project was fully funded through the Amer