Skip to main content

Indra technology manages the longest tunnel in south-east Asia

Indra has installed its smart technology in the control centre of the Chenani road tunnel and has carried out the design, development, implementation and launch of the tunnel's management system, based on its proprietary Horus solution.
July 3, 2017 Read time: 2 mins

509 Indra has installed its smart technology in the control centre of the Chenani road tunnel and has carried out the design, development, implementation and launch of the tunnel's management system, based on its proprietary Horus solution.

The 9.4 km long tunnel, which is said to be the longest in all of India and south-east Asia, has been designed, built and operated by Indian road toll company IL&FS Transportation.

The Horus platform enables centralised, integrated management of the various intelligent traffic systems and security systems that will be deployed in the tunnel and provides compliance with the highest quality and security standards. Among the systems installed by Indra are the automatic incident detection, video surveillance, traffic control, signalling, fire detection, access control and emergency call systems, as well as other sub-systems supplied by local companies, such as lighting, ventilation, communication and energy systems.

The system provides operators with a real-time view of the tunnel, enabling them to monitor the status of the road at all times and providing information for decision-making purposes. The high level of automated operation aids speedy and accurate management of everything that happens in the tunnel, both for routine management purposes and response to emergency situations. The solution will also make it possible to provide real-time information to drivers and deliver security and service quality, which will help to reduce the risk of incidents and optimise the use of resources.

Related Content

  • October 22, 2015
    Indra-Alstom to install tunnel security systems for Spanish high-speed rail link
    A consortium of Indra and Alstom España has won the contract to install public safety and security systems in the six tunnels on the high-speed rail link connecting Antequera and Granada in Spain. The contract also includes system maintenance for a period of 42 months. Over 100 km long, the rail link represents a key infrastructure in the development of the Andalusian Crossrail Project and forms part of the Trans-European Transport Network as one of the priority networks for improving passenger and cargo
  • January 27, 2012
    Integrated command and control solution for UK tunnel
    UK company Sicura Systems is supplying a fully fault-tolerant, integrated command and control solution to the US$416 million New Tyne Crossing project on the A19 near Newcastle in England.
  • August 9, 2012
    Inauguration of India’s Yamuna Expressway project today
    Efkon India has announced that is has provided design, installation, and commissioning solutions for the three main toll plazas and three ramp toll plazas of the Yamuna Expressway Project (YEP) - a 165km highway stretch connecting Delhi with Agra – that will be inaugurated today. The toll plazas comprise a total of 129 lanes and all main plazas have 32 lanes furnished with fully automatic and semi-automatic fare collection system. The solution includes 24 weigh-in-motion (WIM) systems across all main plazas
  • August 9, 2012
    Inauguration of India’s Yamuna Expressway project today
    Efkon India has announced that is has provided design, installation, and commissioning solutions for the three main toll plazas and three ramp toll plazas of the Yamuna Expressway Project (YEP) - a 165km highway stretch connecting Delhi with Agra – that will be inaugurated today. The toll plazas comprise a total of 129 lanes and all main plazas have 32 lanes furnished with fully automatic and semi-automatic fare collection system. The solution includes 24 weigh-in-motion (WIM) systems across all main plazas