Skip to main content

Arizona DOT upgrades camera system

Arizona’s traffic operations centre was built more than twenty years ago; the first traffic camera was installed over Interstate10 in 1990. That’s all changed now thanks to a recent US$2.1 million upgrade of the camera system by Arizona Department of Transportation (ADOT) which replaced cables with fibre optic lines, so the cameras now show fresh images every ten seconds rather than every five minutes. The upgrade has also replaced the 32 video screens in the traffic operations centre, enabling staff to sca
February 22, 2013 Read time: 2 mins
Arizona’s traffic operations centre was built more than twenty years ago; the first traffic camera was installed over Interstate10 in 1990.

That’s all changed now thanks to a recent US$2.1 million upgrade of the camera system by 6576 Arizona Department of Transportation (ADOT) which replaced cables with fibre optic lines, so the cameras now show fresh images every ten seconds rather than every five minutes. The upgrade has also replaced the 32 video screens in the traffic operations centre, enabling staff to scan up to 160 images simultaneously.

Information from the cameras is used provide drivers with the most accurate travel times on the changeable signs above some freeways and to manage incidents and deploy first responders, Highway Patrol cars or tow trucks.

“Now, the system will help give users a much better, accurate story,” said Darrell Bingham, ADOT’s project manager on the upgrade. “The benefit to drivers will be more information when they need it the most to avoid congestion and make informed decisions during their commute.”

Last year, almost 9.4million visitors went to ADOT’s traffic site at az511.gov to check the cameras - nearly 26,000 visits a day from people who rely on the cameras to plan their trips. Travellers can get up-to-the-minute travel times, road conditions and alerts via the web or by calling the toll-free 511 number. The online service gives the added benefit of live traffic footage.

For more information on companies in this article

Related Content

  • Dura-Line smooths the way
    December 9, 2021
    Dura-Line Corporation has made available a portfolio of communications conduits lined with its new, proprietary Silicore ULF (ultra-low friction) material.
  • Dubai metro - the world's longest automated rail system
    July 31, 2012
    David Crawford reviews the recent opening of Dubai's Red Line. The US$7.6bn Dubai Metro, the Phase I Red Line of which started partial operation in September 2009, will be the world's longest driverless rail system on its planned completion in 2011. With a total length of some 75km, it will then overtake the 68.7km Vancouver SkyTrain and be able to carry over 1.2 million passengers on a typical day.
  • Close shave for Brazilian project
    June 12, 2015
    Signing the order to equip a new control room just 45 days before the city hosts a major sporting event is challenging - but some deadlines just cannot be moved. There is nothing like a deadline to concentrate minds and effort as Mitsubishi and the Brazilian city of Belo Horizonte discovered in the run-up to the 2014 World Cup. Although municipal authorities had been considering a new command centre for years, it was the hosting of the World Cup last summer that provided the final impetus.
  • APA supports automated work zone speed enforcement
    July 17, 2015
    A trade association representing the highway construction industry strongly supports automated enforcement of speed limits in work zones and Maryland's experience with a similarly designed program has had very good results, the association head has told a joint Pennsylvania House and Senate committee. According to PennDOT, 24 people were killed in work-zone crashes in 2014, eight more than in 2013. Additionally, there were 1,841 crashes in work zones last year, a slight decrease from the 1,851 crashes