Skip to main content

Variable speed limit signs deployed in Canada

The British Columbia government in Canada has deployed variable speed limit signs along three highways in the province, Highway 99, Highway 5, and Highway 1, which are prone to rapidly changing weather..Variable speed limit signs display the legal speed limit when road and weather conditions change. From 2 June, motorists are required to obey the signs, which are regulatory and enforced by the police. Static message signs at the entrance to each corridor inform travellers they are entering a variable
June 10, 2016 Read time: 2 mins
The British Columbia government in Canada has deployed variable speed limit signs along three highways in the province, Highway 99, Highway 5,  and Highway 1, which are prone to rapidly changing weather..Variable speed limit signs display the legal speed limit when road and weather conditions change.

From 2 June, motorists are required to obey the signs, which are regulatory and enforced by the police.

Static message signs at the entrance to each corridor inform travellers they are entering a variable speed zone. A digital message sign (DMS) at the beginning of each corridor warns drivers of changing weather conditions. Flashing lights installed above each variable speed limit sign are activated when a reduced speed limit is in effect.

Traffic, road and visibility sensors monitor real-time traffic speeds as well as road and weather conditions to provide recommended reduced speeds back to operations staff who then adjust the electronic signs to let drivers know what speed they should be travelling for the current conditions.

Webcams installed along each of the routes monitor traffic and weather conditions to provide drivers and operators at the Regional Transportation Management with real time information on conditions along the routes.

Related Content

  • Real time active traffic management improves travel times
    July 17, 2012
    Traffic management centres (TMC) have traditionally served to provide surveillance and responses to traffic incidents and recurring and non-recurring changes in road networks. Typically, a TMC collected field data from the roadway and transit infrastructure and provided the integration necessary for operators to see what was happening and then coordinate a response. Standard operating procedures (SOPs) guided operators on how to respond to a given situation. It eventually became impractical for TMC operat
  • New Hampshire plans for tomorrow’s communication
    August 21, 2017
    Someone once likened predicting the future to ‘nailing a jelly to the wall’. With ITS, C-ITS and V2X technology progressing at such a pace, predicting the future is more akin to trying to nail three jellies to the wall – but only having one nail. And yet with roadways having a lifetime measured in decades, that is exactly what highway engineers and traffic planners are expected to do. Fortunately, New Hampshire DoT (NHDoT) believes its technological advances may be able to provide a solution. The Central Ne
  • With C-ITS we can get ourselves connected
    June 27, 2025
    Workzones need to be safer for drivers and workers – and the technology exists to harmonise safety with mobility needs, says Swarco’s Daniel Lenczowski
  • Active traffic management - challenges and benefits
    April 12, 2013
    Minnesota DoT has built one of the most intensive Active Traffic Management (ATM) systems on the road today. Like many ITS deployments, the state has gained benefits but also faces many challenges, as Pete Goldin reports. Smart Lanes is the brand name of Minnesota Department of Transportation’s (MnDoT) ATM system on I-35W in the Twin Cities Metro Area. The original system covered 16 miles of I-35W south of Minneapolis starting in 2009, and was extended by two miles in 2011. Additional ATM equipment was inst