Skip to main content

South west’s first smart motorway opens

The first smart motorway scheme in the UK’s south west has been officially launched, covering seven miles of motorway around the Almondsbury interchange and including junctions 19-20 on the M4 and junctions 15-17 on the M5. It is designed to help reduce congestion and improve safety and journey times by introducing variable speed limits and opening the hard shoulder during busy traffic periods. The improvements to the M4 and M5 use a range of technologies and operational systems to reduce congestion and
January 15, 2014 Read time: 2 mins
The first smart motorway scheme in the UK’s south west has been officially launched, covering seven miles of motorway around the Almondsbury interchange and including junctions 19-20 on the M4 and junctions 15-17 on the M5.  It is designed to help reduce congestion and improve safety and journey times by introducing variable speed limits and opening the hard shoulder during busy traffic periods.

The improvements to the M4 and M5 use a range of technologies and operational systems to reduce congestion and smooth the flow of traffic. During busy periods, traffic officers in the regional control centre at Avonmouth will set overhead message signs to inform drivers they can use the hard shoulder as an extra lane and at what speed to drive.

The project included installation of 33 new gantries, refurbishing seven existing ones, resurfacing over 14 miles of carriageway, laying over 30 miles of fibre optic cabling and constructing six emergency refuge areas.

Launching the scheme, Roads Minister Robert Goodwill said: “Every day, more than 140,000 vehicles use this section of motorway which is an essential gateway to the South West. That is why the government has invested almost US$148 million to help improve access and traffic flow on this vital route. This is the first smart motorway in the region and I’m delighted that road users and businesses will be able to benefit from the improvements earlier than planned.”

503 Highways Agency senior project manager Paul Unwin said: “The M4 and M5 scheme demonstrates how a smart and efficient solution can deliver improvements that road users need – more capacity and better management of traffic to reduce congestion and make journey times more reliable.”

For more information on companies in this article

Related Content

  • New opportunities in a data-rich future
    March 19, 2014
    Jason Barnes looks at where the detection and monitoring sector is heading. In the future, there will be no such thing as an un-instrumented road. Just a short time ago, that could have been a quote from a high-level policy document but with the first arrivals of vehicles with 802.11p connectivity – the door-opener to Vehicle-to-X (V2X) applications – it’s a statement which has increasing validity. The technology which uses our roads will also provide information on road conditions but V2X isn’t the only
  • Government sets out blueprint for Northern Powerhouse
    August 14, 2015
    The UK’s Department for Transport (DfT) has set out the blueprint for how US$20 billion of government investment in transport will help create the Northern Powerhouse. The investment aims to make transport better by improving the links, bringing cities closer together and strengthening connections. The blueprint shows how transport links across the north are being transformed by government investment. Transport secretary Patrick McLoughlin said: “This one nation government is determined to close the e
  • Highways England tests ghost busters
    January 25, 2021
    Getting rid of misleading or confusing road markings will be vital for safe AV operation
  • Free-flow upgrade to Holland's Westerschelde tunnel's toll system
    February 1, 2012
    Unbroken service Technolution's Winifred Roggekamp and Dave Marples describe efforts to upgrade the Westerscheldetunnel's tolling system to give free-flow capability. Until 2003 the Flanders region of Zeeland, in the south-west of the Netherlands, was connected to the mainland only by ferry. The new Westerscheldetunnel, a 6.6km toll tunnel, improves communications with the region considerably, taking some 100km off the alternative road journey. In 2006 it was recognised that the toll plaza for the tunnel ne