Skip to main content

South west’s first smart motorway opens

The first smart motorway scheme in the UK’s south west has been officially launched, covering seven miles of motorway around the Almondsbury interchange and including junctions 19-20 on the M4 and junctions 15-17 on the M5. It is designed to help reduce congestion and improve safety and journey times by introducing variable speed limits and opening the hard shoulder during busy traffic periods. The improvements to the M4 and M5 use a range of technologies and operational systems to reduce congestion and
January 15, 2014 Read time: 2 mins
The first smart motorway scheme in the UK’s south west has been officially launched, covering seven miles of motorway around the Almondsbury interchange and including junctions 19-20 on the M4 and junctions 15-17 on the M5.  It is designed to help reduce congestion and improve safety and journey times by introducing variable speed limits and opening the hard shoulder during busy traffic periods.

The improvements to the M4 and M5 use a range of technologies and operational systems to reduce congestion and smooth the flow of traffic. During busy periods, traffic officers in the regional control centre at Avonmouth will set overhead message signs to inform drivers they can use the hard shoulder as an extra lane and at what speed to drive.

The project included installation of 33 new gantries, refurbishing seven existing ones, resurfacing over 14 miles of carriageway, laying over 30 miles of fibre optic cabling and constructing six emergency refuge areas.

Launching the scheme, Roads Minister Robert Goodwill said: “Every day, more than 140,000 vehicles use this section of motorway which is an essential gateway to the South West. That is why the government has invested almost US$148 million to help improve access and traffic flow on this vital route. This is the first smart motorway in the region and I’m delighted that road users and businesses will be able to benefit from the improvements earlier than planned.”

503 Highways Agency senior project manager Paul Unwin said: “The M4 and M5 scheme demonstrates how a smart and efficient solution can deliver improvements that road users need – more capacity and better management of traffic to reduce congestion and make journey times more reliable.”

For more information on companies in this article

Related Content

  • ITS upgrade for George Washington Bridge
    June 29, 2015
    The electronic highway signage system and field devices that provide real-time travel information for the 300,000 daily users of New York’s George Washington Bridge are to undergo a major overhaul in a US$65.1 millio0n project. The Port Authority of New York has approved the project to replace the intelligent transportation system (ITS) which includes the upgrade and replacement of 11 existing variable message signs and the installation of seven new ones; the installation of a new overhead sign structure
  • Jacobs JV wins contract for WestConnex New M5 project in Australia
    May 18, 2016
    A joint venture of Jacobs Engineering Group and Aurecon has been awarded a contract to carry out the engineering design for the multi-billion dollar WestConnex New M5 Project in Sydney, Australia. WestConnex is a critical part of the New South Wales (NSW) Government’s integrated transport solution and aims to significantly reduce the congestion impacting hundreds of thousands of NSW road users every day. The New M5, which is expected to double the capacity of the heavily congested M5 East motorway co
  • Birmingham CAZ is green for go
    July 26, 2021
    For urban authorities worldwide, the health of residents is racing up the political agenda. Ben Spencer looks at how one city - Birmingham, UK - has established its own Clean Air Zone and is investing in alternative-fuel vehicles and public transport incentives
  • Improved safety information in M55 signs upgrade
    December 12, 2016
    A US$567,000 (£450,000) Highways England project to provide drivers using the M55 in Lancashire with better warnings about congestion, incidents and bad weather has been completed. Five of the latest electronic variable message signs, which can display pictorial as well as text messages, have been installed along the eastern end of the motorway between junction 1 at Broughton and the interchange with junction 32 of the M6. The new signs will allow Highways England traffic officers at the North West Re