Skip to main content

New Orleans to implement ITS traffic management project

Louisiana Department of Transportation and Development Secretary Sherri H. LeBas has announced the New Orleans Core ITS project that will outfit the I-10 corridor, from Kenner to the Central Business District (CBD), I-610 and US 90 Business with 24 new surveillance cameras and eight dynamic message signs. These will be monitored and operated by staff at the regional transportation management centre. The aim is to improve travel by helping drivers avoid traffic congestion and use alternate routes, ultimately
July 12, 2012 Read time: 2 mins
6174 Louisiana Department of Transportation and Development Secretary Sherri H. LeBas has announced the New Orleans Core ITS project that will outfit the I-10 corridor, from Kenner to the Central Business District (CBD), I-610 and US 90 Business with 24 new surveillance cameras and eight dynamic message signs. These will be monitored and operated by staff at the regional transportation management centre. The aim is to improve travel by helping drivers avoid traffic congestion and use alternate routes, ultimately shortening and providing more reliable commute times.

The project is estimated to cost between US$5-$7.5 million and take 6-9 months to complete, but the savings in traffic safety, vehicle hours and delay time will take on a whole new meaning during the many forthcoming special events scheduled to take place in the Crescent City. In addition, Captain Carl Saizan, commander of Louisiana State Police Troop B, says the project will provide important new emergency capabilities. "The future of first responder communications is interoperability amongst as many agencies as possible. This initiative will allow us to pre-determine traffic flow on the main arteries in the event of an evacuation requiring the activation of contraflow – something we didn’t have during Hurricane Katrina."

Related Content

  • March 16, 2015
    Report analyses multiple ITS projects to highlight cost and benefits
    Every year in America cost benefit analysis is carried out on dozens of ITS installations and pilot studies and the findings, along with the lessons learned, are entered into the Department of Transportation’s (USDOT’s) web-based ITS Knowledge Resources database. This database holds more than 1,600 reports and periodically the USDOT reviews the material on file to draw conclusions from this wider body of evidence. It has just published one such review ITS Benefits, Costs, and Lessons Learned: 2014 Update Re
  • December 4, 2018
    Tecsidel’s Pan-American Highway tunnel eases Lima’s traffic woes
    The Pan-American Highway connects the US and Canada with Latin America, running for thousands of miles from Alaska in the north to Argentina in the south. Mauro Nogarin finds that one tunnel built underneath it is now providing relief for thousands of travellers each day On the Pan-American Highway, the lengthy series of roads which spans both American continents - from the US state of Alaska to the Latin American country of Argentina - ITS solutions are many and varied. One of these, in Peru’s capital
  • March 23, 2015
    I-80 Smart Corridor sets the ITS standard for California's Bay Area
    Colin Sowman looks at California’s ‘smartest’ road which will open this spring to counter congestion and accidents on one of the Bay Area’s busiest interstates. Interstate 80 (I-80) is one of the busiest roads in the San Francisco Bay area with up to 270,000 vehicles using the corridor every day. The section between the Carquinez Bridge in Crockett and the Bay Bridge not only suffers congestion during the working week but also at weekends. Traditional remedies such as building additional lanes (there are al
  • March 23, 2015
    I-80 Smart Corridor sets the ITS standard for California's Bay Area
    Colin Sowman looks at California’s ‘smartest’ road which will open this spring to counter congestion and accidents on one of the Bay Area’s busiest interstates. Interstate 80 (I-80) is one of the busiest roads in the San Francisco Bay area with up to 270,000 vehicles using the corridor every day. The section between the Carquinez Bridge in Crockett and the Bay Bridge not only suffers congestion during the working week but also at weekends. Traditional remedies such as building additional lanes (there are al