Skip to main content

Mayor unveils expanded traffic-busting plans to keep London moving

The Mayor of London, Boris Johnson, has unveiled the new measures Transport for London (TfL) is introducing to ease traffic in the capital and minimise disruption on the roads as major work to improve the network continues as part of the Mayor’s US$6 billion Road Modernisation Plan. The innovations include: Trials of new technology - for the first time on the TfL road network a new generation of digital road signs will provide people with real-time information on journeys using major routes into London.
September 30, 2015 Read time: 3 mins
The Mayor of London, Boris Johnson, has unveiled the new measures 1466 Transport for London (TfL) is introducing to ease traffic in the capital and minimise disruption on the roads as major work to improve the network continues as part of the Mayor’s US$6 billion Road Modernisation Plan.
 
The innovations include: Trials of new technology - for the first time on the TfL road network a new generation of digital road signs will provide people with real-time information on journeys using major routes into London. TfL is also trialling a new operating system of temporary traffic lights that can be remotely controlled from TfL’s traffic control centre. This will mean the phasing of traffic lights can be changed quickly and efficiently by staff at the control centre to improve traffic flow and cut delays through roadwork areas.
 
A London 2012 Games-style 24/7 communication campaign – each day TfL keeps its 450,000 @tfltrafficnews followers and website users up-to-date with the very latest traffic information and the calendar of works being carried out so people can plan ahead.
 
Expanding use of road junction technology, including the world-leading Split Cycle Offset Optimisation Technique (SCOOT), to optimise traffic light timings in outer London. The introduction of SCOOT is claimed to reduce delays by up to 12 per cent at each junction where it has been installed. By May 2016, almost 4,000 sites will be using this technology across London and by 2018, more than three-quarters of London’s 6000 junctions will be upgraded with SCOOT, helping to manage and reduce congestion.
 
Working with sat-nav companies and encouraging firms to take advantage of the latest technology by using TfL’s extensive data feeds to update sat-navs so motorists can be provided with real-time TfL information as they drive, ensuring they can take the most appropriate routes.
 
These measures are being developed to accompany existing ongoing work to ease congestion, including: Dynamically managing London’s road network using the 24/7 traffic control centre in real-time; Managing incidents and congestion hot spots through the Roads Policing Units; Working with the freight industry to retime deliveries to avoid the busiest times; A ‘lane rental scheme’ which targets roadworks at the busiest locations and busiest times. It is already seeing over 90 per cent of work carried out during quieter periods – massively reducing disruption. All surplus money raised through the Lane Rental scheme is reinvested into measures to further reduce the disruption, including trials of temporary traffic signals, new automatic roadwork monitoring cameras to allow TfL to better determine whether work is taking place and better use of rapid cure reinstatement materials to help reopen roads quicker, significantly reducing traffic disruption.
 
With improvement works planned until 2021/22, TfL claims its Road Modernisation Plan includes hundreds of projects to improve the streets as the capital grows in size. Across London, improvements are being delivered day and night as new cycle routes are created, traffic signals, pavements and highways are upgraded; new public spaces are made; and junctions are re-designed to make them safer.
 
TfL is also looking at long-term measures to tackle road congestion in the coming decades. In January, it will host an extensive exhibition outlining the latest plans for strategic measures to tackle congestion and cleaning London’s air. This will include plans for new tunnels and fly-unders that open new areas up for redevelopment, as well as measures to help keep freight deliveries serving the capital while also reducing congestion at peak-times.

For more information on companies in this article

Related Content

  • Siemens influences congestion reduction
    March 12, 2021
    When it comes to reducing congestion, even relatively small interventions can have significant and positive knock-on effects, suggests Steve O’Sullivan of Siemens Mobility
  • FTA launches cycle-friendly HGV sat-nav
    May 28, 2013
    As part of its continuing efforts to raises safety standards in the logistics industry, the UK’s Freight Transport Association (FTA) launched what it says is the world’s first satellite navigation system incorporating an HGV Cyclist Alert system. Currently only available in London, the Pro Nav 420’s HGV Cyclist Alert warns the truck driver when approaching a section of road that has been designated by Transport for London (TfL) as a “HGV/Cyclist convergence area”, such as junctions where large numbers of HG
  • Measuring vehicle lengths with a single loop - promising results
    July 27, 2012
    District 7 of Caltrans has been conducting trials to see whether the use of a single inductive loop to measure vehicle lengths and so identify heavy trucks is feasible. So far, the results have been very promising, according to Lead Transportation Engineer Steve Malkson. Between them, the adjoining ports of Los Angeles and Long Beach, the US's two biggest, cover some 10,700 acres (43km2) and 68 miles (109km) of waterfront.
  • Success of London’s congestion charge scheme
    February 15, 2013
    Said to be the biggest congestion charge scheme to launch in any city, the London scheme got off to a smooth start ten years ago on 17 February 2003, much to the surprise of London's then mayor Ken Livingstone, who ten years later says “it turned out better than I expected.” None of the anticipated pre-7am congestion as drivers attempted to avoid the charge happened, and by the end of the first day 57,000 drivers had paid it. The main problem seemed to be that buses were all running ahead of time and had t