Skip to main content

Smarter motorway for West Yorkshire

Drivers on the M1 near Wakefield will benefit from reduced congestion and improved journey times after the final phase of a new US$172 million smart motorway went live. The Highways England scheme along a seven-mile stretch of motorway between junction 39 and junction 42 is the first all lane running motorway in the north, where the hard shoulder has been permanently converted to an extra lane. The smart motorway uses the latest technology to monitor traffic levels and variable speed limits on overhea
February 2, 2016 Read time: 2 mins
Drivers on the M1 near Wakefield will benefit from reduced congestion and improved journey times after the final phase of a new US$172 million smart motorway went live.

The 8101 Highways England scheme along a seven-mile stretch of motorway between junction 39 and junction 42 is the first all lane running motorway in the north, where the hard shoulder has been permanently converted to an extra lane.

The smart motorway uses the latest technology to monitor traffic levels and variable speed limits on overhead electronic signs keep vehicles moving, improving the reliability of journeys. The first phase of the scheme was opened in December between junctions 39 and 4.

Infrared CCTV will also be used 24 hours a day to enable staff in the regional control centre near Wakefield to respond quickly to incidents, closing lanes using red Xs on overhead signs if necessary. Drivers will also be able to use emergency refuge areas if they break down.

The smart motorway between junctions 39 and 42 includes: Seven miles of reinforced concrete barriers in the central reservation; Seven miles of resurfacing the equivalent to 46 football pitches; Ten overhead gantries; 38 electronic signs; 6,172 reflective road studs

Work to convert the M1 to a smart motorway between junctions 39 and 42 began in November 2013. Temporary narrow lanes and a 50mph speed limit have been in place to keep three lanes open to traffic in each direction and to create a safe working environment.

The M62 between junction 25 and junction 30 was the first smart motorway in Yorkshire to go live back in 2013. The hard shoulder is used as an extra lane during peak times whereas it has been permanently converted to an extra lane on the new M1 scheme.

For more information on companies in this article

Related Content

  • US DOTs introduce measures to stop wrong-way driving
    March 28, 2018
    Wrong-way driving (WWD) is a remarkably innocuous term for incidents that all too often cause some of the worst accidents that emergency services have to deal with. Several US states are now taking steps to minimise the problem, as Alan Dron finds out. You’re driving down a highway at night when you see approaching headlights. You initially assume they are merely those of an oncoming car on the opposite carriageway. It’s only when they are within 200 yards or so that you realise that the other driver is in
  • Utah Department of Transportation: How we’re using traffic analytics software
    February 4, 2025
    Our use of Iteris ClearGuide lets our traffic operations engineers interpret critical probe traffic data without the need for statisticians and software developers
  • Variable speed limits to be introduced in Scotland
    November 15, 2012
    Motorists using the M90 in Scotland will face the country’s first variable speed limits in three weeks time when a new traffic control system is launched on the road north of the Forth Road Bridge. The intelligent transport system, which goes live on 4 December on the M90 northbound, has been installed as part of construction of the Forth Replacement Crossing, which is due to open in four years time. Speeds will be automatically lowered by traffic sensors under the road surface when they detect congestion,
  • State of the art ITS technology for Doha tunnel management system
    January 31, 2012
    Husam Musharbash, Traffic Tech Group, talks about tunnel management system implementation on the new route between Doha and the soon-to-open New Doha International Airport. The new Ras Abu Aboud Tunnel in Qatar, which opened to traffic in January of this year, will serve the New Doha International Airport once the latter opens in 2011.