Skip to main content

Smarter motorway for West Yorkshire

Drivers on the M1 near Wakefield will benefit from reduced congestion and improved journey times after the final phase of a new US$172 million smart motorway went live. The Highways England scheme along a seven-mile stretch of motorway between junction 39 and junction 42 is the first all lane running motorway in the north, where the hard shoulder has been permanently converted to an extra lane. The smart motorway uses the latest technology to monitor traffic levels and variable speed limits on overhea
February 2, 2016 Read time: 2 mins
Drivers on the M1 near Wakefield will benefit from reduced congestion and improved journey times after the final phase of a new US$172 million smart motorway went live.

The 8101 Highways England scheme along a seven-mile stretch of motorway between junction 39 and junction 42 is the first all lane running motorway in the north, where the hard shoulder has been permanently converted to an extra lane.

The smart motorway uses the latest technology to monitor traffic levels and variable speed limits on overhead electronic signs keep vehicles moving, improving the reliability of journeys. The first phase of the scheme was opened in December between junctions 39 and 4.

Infrared CCTV will also be used 24 hours a day to enable staff in the regional control centre near Wakefield to respond quickly to incidents, closing lanes using red Xs on overhead signs if necessary. Drivers will also be able to use emergency refuge areas if they break down.

The smart motorway between junctions 39 and 42 includes: Seven miles of reinforced concrete barriers in the central reservation; Seven miles of resurfacing the equivalent to 46 football pitches; Ten overhead gantries; 38 electronic signs; 6,172 reflective road studs

Work to convert the M1 to a smart motorway between junctions 39 and 42 began in November 2013. Temporary narrow lanes and a 50mph speed limit have been in place to keep three lanes open to traffic in each direction and to create a safe working environment.

The M62 between junction 25 and junction 30 was the first smart motorway in Yorkshire to go live back in 2013. The hard shoulder is used as an extra lane during peak times whereas it has been permanently converted to an extra lane on the new M1 scheme.

For more information on companies in this article

Related Content

  • Rennicks launches Bluetooth traffic monitoring at Traffex
    April 10, 2015
    Rennicks UK, in conjunction with Bluetrace, is using Traffex 2015 to launch a new traffic management system which it says is a significant leap forward in the battle to improve safety and reduce congestion. The system, developed in conjunction with Bluetrace, uses the most sensitive Bluetooth and wi-fi technology on the market to monitor and measure traffic movement from the roadside by connecting to devices inside vehicles. The data is transmitted to a central location to present a clear, real-time p
  • TfL outlines new 20mph speed limit sites in central London
    March 13, 2015
    The Mayor of London and Transport for London (TfL) have outlined plans for eight new pilots of 20mph speed limits on the TfL road network (TLRN) as part of continuing work to reduce road casualties, increase active travel and enhance the areas where people live, work and shop. The first confirmed pilot location is in Tower Hamlets, which is planned to be introduced in April when all borough roads in Tower Hamlets are made 20mph. Once implemented, the route could then be extended out to cover the wider Shore
  • Enforcement suppliers highlight industry best practice
    March 15, 2012
    Major suppliers of enforcement technology highlight the countries, regions or cities that they consider to be leading the way in reduction of road traffic violations. The French government’s ambitious programme of enforcing traffic law violations has proven to be an unrivalled success and is continuing to bring improvements in road safety with innovative enforcement technology.
  • Managed lanes – the riddle wrapped up in an enigma
    December 15, 2014
    Managed lanes have something of a patchy track record and can pose authorities problems as well as solutions. Many authorities in the US and beyond have converted, or are converting, parts of the highway network into ‘Managed Lanes’ and charging motorists a fee to avoid the delays on the adjoining free use lanes. Some authorities have converted underused High Occupancy Vehicle (HOV) lanes into priced-managed high occupancy/toll lanes (HOT lanes) whereby the price charged can vary depending on a number of fa