Skip to main content

Kapsch TrafficCom wins further contract in Chile

Kapsch TrafficCom has secured a new contract in Chile through a subsidiary company. It will implement the tolling system and intelligent transport system (ITS) for the first 15 km of the Ruta 5 Norte, located in the north of Santiago and operated by Sociedad Concesionaria Autopista del Aconcagua (SCADA). The contract, valued at around US$23 million including maintenance services, includes all the technology needed to upgrade a highway section into the urban standard of Santiago, including ten multi-lane
September 30, 2015 Read time: 2 mins
4984 Kapsch TrafficCom has secured a new contract in Chile through a subsidiary company. It will implement the tolling system and intelligent transport system (ITS) for the first 15 km of the Ruta 5 Norte, located in the north of Santiago and operated by Sociedad Concesionaria Autopista del Aconcagua (SCADA).

The contract, valued at around US$23 million including maintenance services, includes all the technology needed to upgrade a highway section into the urban standard of Santiago, including ten multi-lane free-flow gantries, electronic toll collection back office, conventional manual tolling system, full ITS solution including an advanced traffic management system, control centre, communication system, video monitoring system, video wall, emergency telephones, traffic detectors, weather stations and variable message signs.

The system will enable the road authorities to manage, monitor, and maintain the highways whilst providing motorists with relevant traffic information.

“This contract highlights the confidence that Chilean operators have in Kapsch’s established and sophisticated tolling technology, whilst at the same time, paving the way for our organisation to become a leader in the ITS segment in the Latin-American market,” says André F. Laux, chief operating officer, Kapsch TrafficCom.

For more information on companies in this article

Related Content

  • South Africa's first multi-lane free-flow tolling top of the line
    February 3, 2012
    Kapsch's Kjell Arnesson talks about the first multi-lane free-flow tolling project in South Africa. In South Africa, installation is ongoing as part of the Gauteng Freeway Improvement Project (GFIP) of the country's first Multi-Lane Free-Flow (MLFF) tolling system.
  • Test 7th January 2016 News 1
    January 6, 2016
    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniamLorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
  • Kapsch TrafficCom to upgrade Massachusetts ITMS
    June 28, 2016
    Kapsch TrafficCom North America has secured a four year, US$11.5 million (€10.4 million) contract to upgrade and modernise the integrated transportation management system (ITMS) at the Highway Operations Center (HOC) of the Massachusetts Department of Transportation (MassDOT). The new system will manage all of the Department’s state-wide roadway network and the Boston Metropolitan Highway System tunnel complex and facilities. The next generation ITMS, based on Kapsch’s DYNAC software suite, will efficien
  • No in-road equipment for Queensland's free flow toll bridge
    February 1, 2012
    By May this year, the new Gateway Bridge in Brisbane, which is being built alongside an existing bridge, will be open. With it will come an end-to-end free-flow tolling system. Interview with Sue Caelers, Queensland Motorway Ltd. Queensland Motorways Ltd owns and operates 61km of roadway in the area around Brisbane, Australia. This includes the Gateway Bridge and the Gateway Extension, Logan and Port of Brisbane motorways.