Skip to main content

Indra consortium awarded east-west Algeria highway contract

A consortium led by Codiser and including Indra has been awarded a contract to build facilities and provide equipment to operate a 380 kilometre stretch of the east-west Algerian highway. The contract, awarded by L’Algerienne de Gestion des Autoroutes (AGA), the organisation responsible for managing, operating, maintaining and servicing the Algerian national highway network, covers a stretch that links the cities of Hammam El Bibane and Bou Kadir, via the country's capital Algiers, in the central sectio
June 17, 2014 Read time: 2 mins
A consortium led by Codiser and including 509 Indra has been awarded a contract to build facilities and provide equipment to operate a 380 kilometre stretch of the east-west Algerian highway.

The contract, awarded by L’Algerienne de Gestion des Autoroutes (AGA), the organisation responsible for managing, operating, maintaining and servicing the Algerian national highway network, covers a stretch that links the cities of Hammam El Bibane and Bou Kadir, via the country's capital Algiers, in the central section of the three identified by AGA for the construction of the new 1,216 kilometer highway from the Tunisian border to Morocco.

Indra will be responsible for supplying and implementing technology for the traffic control centre and the toll and remote toll system for 141 lanes. The control centre will feature intelligent traffic systems (ITS), including a video surveillance system via closed circuit television (CCTV), as well as technology to automatically detect incidents, measure traffic levels, run meteorological stations and manage variable message panels.

These ITS systems will support permanent monitoring of highway traffic conditions, incident control and automated alarms to provide faster and more efficient services, as well as offering real-time information to drivers regarding traffic levels, journey times, suggestions and weather data, as well as other benefits.

The contract also includes maintenance of all systems for a three-year period.

According to Indra, this is a pioneering project in Algeria, with the east-west highway being the first in the country to feature latest generation traffic technology that meets the most stringent international safety and quality standards. The technology will help improve road safety and cut journey times, as well as driving down fuel consumption and benefitting the environment.

For more information on companies in this article

Related Content

  • Three for Q-Free in the US
    May 1, 2025
    Kinetic Mobility will be used in Denver, Washington DC and Dallas-Fort Worth
  • Modernising India's bus travel
    August 29, 2012
    Award-winning ITS initiatives are promising modernisation of bus travel as a key part of development plans for cities of the Indian state of Karnataka. The Indian state of Karnataka is poised to launch the next stage of a major rollout of ITS technology on its bus network following the August 2012 go-live of an award-winning passenger information system. The Karnataka State Road Transport Corporation (KSRTC), which is owned by the state government
  • Managed lanes – the riddle wrapped up in an enigma
    December 15, 2014
    Managed lanes have something of a patchy track record and can pose authorities problems as well as solutions. Many authorities in the US and beyond have converted, or are converting, parts of the highway network into ‘Managed Lanes’ and charging motorists a fee to avoid the delays on the adjoining free use lanes. Some authorities have converted underused High Occupancy Vehicle (HOV) lanes into priced-managed high occupancy/toll lanes (HOT lanes) whereby the price charged can vary depending on a number of fa
  • Sri Lanka launches new highway traffic management system
    August 11, 2015
    Sri Lanka has recently opened the new highway traffic management system (HTMS), implemented by Mitsubishi Heavy Industries, (MHI) on the country’s Southern Expressway. The installation is the country's first full-scale system of its kind, and it is expected to contribute significantly to improved safety and reduced congestion on a local expressway. The expressway, which opened in 2013, stretches 120 kilometres from Colombo, the largest city in Sri Lanka, to Matara. Construction work was performed under