Skip to main content

Indra consortium awarded east-west Algeria highway contract

A consortium led by Codiser and including Indra has been awarded a contract to build facilities and provide equipment to operate a 380 kilometre stretch of the east-west Algerian highway. The contract, awarded by L’Algerienne de Gestion des Autoroutes (AGA), the organisation responsible for managing, operating, maintaining and servicing the Algerian national highway network, covers a stretch that links the cities of Hammam El Bibane and Bou Kadir, via the country's capital Algiers, in the central sectio
June 17, 2014 Read time: 2 mins
A consortium led by Codiser and including 509 Indra has been awarded a contract to build facilities and provide equipment to operate a 380 kilometre stretch of the east-west Algerian highway.

The contract, awarded by L’Algerienne de Gestion des Autoroutes (AGA), the organisation responsible for managing, operating, maintaining and servicing the Algerian national highway network, covers a stretch that links the cities of Hammam El Bibane and Bou Kadir, via the country's capital Algiers, in the central section of the three identified by AGA for the construction of the new 1,216 kilometer highway from the Tunisian border to Morocco.

Indra will be responsible for supplying and implementing technology for the traffic control centre and the toll and remote toll system for 141 lanes. The control centre will feature intelligent traffic systems (ITS), including a video surveillance system via closed circuit television (CCTV), as well as technology to automatically detect incidents, measure traffic levels, run meteorological stations and manage variable message panels.

These ITS systems will support permanent monitoring of highway traffic conditions, incident control and automated alarms to provide faster and more efficient services, as well as offering real-time information to drivers regarding traffic levels, journey times, suggestions and weather data, as well as other benefits.

The contract also includes maintenance of all systems for a three-year period.

According to Indra, this is a pioneering project in Algeria, with the east-west highway being the first in the country to feature latest generation traffic technology that meets the most stringent international safety and quality standards. The technology will help improve road safety and cut journey times, as well as driving down fuel consumption and benefitting the environment.

For more information on companies in this article

Related Content

  • ‘Free’ power for signs, shelters and so much more
    March 17, 2016
    David Crawford looks at the sunny side of the street. Solar power has been relatively slow in entering the transport sector, but a current blossoming of activity bodes well for the large-scale harnessing of an alternative energy that is zero-emission at source and, in practical terms, infinitely renewable. Traffic management and traveller information systems, and actual vehicles, are all emerging as areas for deployment. Meanwhile roads themselves are being viewed as new-style, fossil fuel-free ‘power stati
  • As east coast battles blizzard, IBTTA praises toll authorities
    January 25, 2016
    In advance of what turned out to be blizzard conditions along the US East Coast over the weekend, tolling authorities throughout the region shifted into high gear to prepare for the extreme, winter weather developments. “Toll facility operations sweat the details, plan well ahead, have the necessary tools and equipment needed for severe weather events and know how to use them,” said Patrick D. Jones, executive director and CEO of the International Bridge, Tunnel and Turnpike Association (IBTTA). “Our t
  • Salvador metro engineering contract awarded to Egis
    January 9, 2014
    French engineering and construction firm Egis has been awarded a US$16 million engineering contract by Brazil’s build and operate concessionaire CCR (Companhia de Concessões Rodoviárias) for the construction of the Salvador metro in the state capital of Bahia, Brazil. The project comprises the completion of the seven kilometre line 1, which is partly underground, the construction of five kilometres of extensions to this first line and the construction of the 24 kilometre line 2, serving Salvador’s inter
  • Vietnam plans intelligent transportation systems
    December 10, 2012
    The Vietnamese government is to draw up new regulations as part of its plan to implement intelligent transportation systems (ITS) in 2013. The project will be executed in three stages from 2012 until 2030. During the first phase, between 2012 and 2015, three traffic control centres will be built to control traffic in the north, central and south regions of the country. During this phase, traffic management equipment will be installed, including closed circuit television cameras, weather forecasting equipm