Skip to main content

Indra consortium awarded east-west Algeria highway contract

A consortium led by Codiser and including Indra has been awarded a contract to build facilities and provide equipment to operate a 380 kilometre stretch of the east-west Algerian highway. The contract, awarded by L’Algerienne de Gestion des Autoroutes (AGA), the organisation responsible for managing, operating, maintaining and servicing the Algerian national highway network, covers a stretch that links the cities of Hammam El Bibane and Bou Kadir, via the country's capital Algiers, in the central sectio
June 17, 2014 Read time: 2 mins
A consortium led by Codiser and including 509 Indra has been awarded a contract to build facilities and provide equipment to operate a 380 kilometre stretch of the east-west Algerian highway.

The contract, awarded by L’Algerienne de Gestion des Autoroutes (AGA), the organisation responsible for managing, operating, maintaining and servicing the Algerian national highway network, covers a stretch that links the cities of Hammam El Bibane and Bou Kadir, via the country's capital Algiers, in the central section of the three identified by AGA for the construction of the new 1,216 kilometer highway from the Tunisian border to Morocco.

Indra will be responsible for supplying and implementing technology for the traffic control centre and the toll and remote toll system for 141 lanes. The control centre will feature intelligent traffic systems (ITS), including a video surveillance system via closed circuit television (CCTV), as well as technology to automatically detect incidents, measure traffic levels, run meteorological stations and manage variable message panels.

These ITS systems will support permanent monitoring of highway traffic conditions, incident control and automated alarms to provide faster and more efficient services, as well as offering real-time information to drivers regarding traffic levels, journey times, suggestions and weather data, as well as other benefits.

The contract also includes maintenance of all systems for a three-year period.

According to Indra, this is a pioneering project in Algeria, with the east-west highway being the first in the country to feature latest generation traffic technology that meets the most stringent international safety and quality standards. The technology will help improve road safety and cut journey times, as well as driving down fuel consumption and benefitting the environment.

For more information on companies in this article

Related Content

  • Texas & South Dakota wins for Iteris
    March 28, 2024
    Contracts involve its ClearMobility platform and ClearRoute traveller information system
  • Temporary CCTV poses more challenges than permanent installations
    June 12, 2015
    Long-term roadworks pose particular problems for temporary surveillance installations. Converting the hard shoulder to a running lane, either full- or part-time, is the UK Highways Agency’s solution to ease motorway congestion. This is leading to a number of long-term projects where large stretches of the hard shoulder are closed off by temporary concrete barriers and during these roadwork programmes, temporary CCTV cameras are deployed to monitor and record vehicle traffic and workers.
  • Contracts awarded for London’s traffic signals upgrade
    July 18, 2014
    Transport for London (TfL) has awarded new traffic signals maintenance contracts, worth around US$542 million for up to eight years, which will see the capital’s 6,000 traffic signals upgraded and maintained to the latest, greenest standards. Awarded to Telent Technology Services for west and south-west London, Siemens for north and north-west London and Cubic Transportation Systems for south-east London, the new Traffic Control Management Services contracts will help expand the use of intelligent traf
  • Canada looks to HOT lanes to tackle congestion
    March 16, 2017
    David Crawford sees an evidence-based approach to HOT lane conversions. Canada’s first high occupancy toll (HOT) lanes opened on 16 September 2016 as a pilot on a 16.5km section of existing high occupancy vehicle (HOV) lanes running in both directions along Toronto’s Queen Elizabeth Way. Promised in two recent budgets