Skip to main content

Danish tunnel gets Afry ITS system

Project is designed to reduce heavy goods vehicle traffic in centre of Copenhagen
By David Arminas September 28, 2022 Read time: 2 mins
Control system will collect, analyse and visualise data to provide tunnel operators with safety info (image courtesy Danish Road Directorate / Vejdirektoratet)

Afry has secured a €9.4 million order for the installation of a Scada system in connection with the construction of the Nordhavn Tunnel in Denmark.

Scada - supervisory control and data acquisition - is a control system which will collect, analyse and visualise data to provide tunnel operators with information about incidents, technical errors and when to implement safety precautions.

Nordhavn Tunnel is one of the largest infrastructure projects in the Danish capital Copenhagen in decades. The project entails the construction of a 1.4km tunnel across Svanemølle Bay and the construction of a replacement harbour. 

Scada architecture comprises computers, networked data communications and graphical user interfaces for high-level supervision of machines and processes. It also covers sensors and other devices, such as programmable logic controllers.

Apart from the Scada system, Afry also provides ITS and internal television for the project that is designed to to reduce the number of heavy goods vehicles in the inner city of Copenhagen.

Expected to be ready for traffic in 2027, the new tunnel will connect the two city areas of Østerbro and Nordhavn, and connect with the existing 600m-long Nordhavnsvej Tunnel that has its own Scada system.

Afry, a Danish engineering design and IT solutions company, has worked with the client Danish Road Directorate on various assignments since the 1990s.

The directorate chose to separate the control system from the actual construction project and find an expert in control systems for tunnels.

”It is important that we learn from the lessons made by Copenhagen Municipality when they constructed Nordhavnsvej Tunnel,” said Silas Nørager, project manager at the Danish Road Directorate and responsible for the control system in Nordhavn Tunnel.

“Our focus is to have a fully-integrated system that works from day one between the two road stretches. It’s a technically challenging task and then there is the added difficulty that it has to connect with the existing Scada system in Nordhavnsvej Tunnel,” said Nørager.


 

For more information on companies in this article

Related Content

  • Yutraffic Varia chosen for Sydney's new harbour crossing
    January 3, 2024
    Western Harbour Tunnel is being built to take pressure off existing routes in Australian city
  • UK's Hindhead tunnel pushes the boundaries of traffic management
    January 23, 2012
    The new Hindhead Tunnel is the first in the UK to use radar-based incident detection. Paul Arnold, project manager with the Highways Agency, talks about the project. The comparatively remote location of the A3 Hindhead Tunnel has resulted in it becoming one of the most sophisticated in the UK in terms of monitoring and control systems, according to Paul Arnold, project manager for the Highways Agency (HA), which manages strategic roads in England and Wales. It is the first tunnel in the UK to use radar for
  • Moxa provides clear vision for Caldecott Tunnel’s Fourth Bore
    September 15, 2014
    Caldecott Tunnel’s new Fourth Bore is utilising a bespoke high-capacity monitoring and communications network from Moxa. The Caldecott Tunnel connects Contra Costa and Alameda counties in Northern California and traditionally it has suffered severe congestion - especially during peak hours. Opened in 1937 as a twin-bore arrangement, by 1964 the increase in traffic volumes led to a third bore being added. Shortly after the third bore was opened a tidal flow was introduced with the centre bore alternating in
  • Transurban lights up tunnel to help drivers pace themselves
    March 31, 2023
    Steep exit from Burnley Tunnel creates congestion for Melbourne's wider road network