Skip to main content

'190,000 trips' on day 1 of Sydney Metro extension

15.5km extension means 2,645 new metro services will travel through city each week
By Adam Hill August 20, 2024 Read time: 2 mins
Lucky people (image: NSW Government | Sydney Metro)

More than 190,000 trips were made on the first day (19 August) of the Sydney Metro extension, according to NSW Government.

The new driverless service in the Australian city extends from the north-west, under the famous harbour for the first time, and through the Sydney central business district, with six brand-new underground stations - Crows Nest, Victoria Cross, Barangaroo, Martin Place, Gadigal and Waterloo - and new metro platforms at Central and Sydenham stations.  

The 15.5km extension is the latest stage of the M1 Northwest & Bankstown Line, which has stops at 21 stations between Tallawong and Sydenham. The remaining 13km of the M1 Line will open after the conversion of 10 existing stations on the T3 Bankstown Line.

Around 30 services per hour run at peak times, with capacity to move more people across Sydney Harbour in the busiest hour than the Sydney Harbour Bridge and Sydney Harbour Tunnel combined.

It means 2,645 new metro services will travel through the heart of the city each week, moving 17,000 people each way per hour in the morning rush hour.

A train runs every four minutes in the peak, seven minutes during weekdays between morning and afternoon peak services (increasing after the first month to a train every five minutes) and every 10 minutes during off peak and on weekends.

There are approximately 100 CCTV cameras at every station and 38 cameras inside each train, with 600 secure bike parking spaces at Crows Nest, Victoria Cross, Waterloo and Sydenham, as part of 900 new bike parking spaces across all eight stations.

Platform screen door technology keeps riders away from tracks.

Minister for transport Jo Haylen says: "This is the biggest change to Sydney’s public transport system since the opening of the Sydney Harbour Bridge. It’s going to double rail capacity across our harbour, take pressure off our heavy rail network and deliver a fantastic new transport service for passengers right across our city.”

Sydney Metro chief executive Peter Regan says the new M1 City Line is open "after a year of testing and commissioning, including more than 200 simulated exercises that have included disruption, emergency scenarios and security drills".

For more information on companies in this article

Related Content

  • Northern Futures: improvements for northern road and rail
    November 6, 2014
    As the Northern Futures Summit begins, UK Deputy Prime Minister Nick Clegg announces better trains in the north to reduce overcrowding and cut journey times. More than 25 million people use cross-Pennine rail routes every year, and over a third of passengers have to stand during their commute. By 2025 the Deputy Prime Minister wants to see electrified cross-Pennine links between Liverpool and Manchester on one side and Leeds, Sheffield, Newcastle and Hull on the other. This will shorten journey times
  • Thales wins Montreal Metro communications contract
    March 26, 2012
    Société de Transport de Montréal (STM) has awarded Thales a contract for a high performance broadband radio network communication system. It will comprise a management system, over 250 wayside radios, onboard radios, antennas for installation throughout the tunnels and on STM’s train fleet, network security devices and CCTV cameras for monitoring passenger flow at all station platforms.
  • Birmingham CAZ is green for go
    July 26, 2021
    For urban authorities worldwide, the health of residents is racing up the political agenda. Ben Spencer looks at how one city - Birmingham, UK - has established its own Clean Air Zone and is investing in alternative-fuel vehicles and public transport incentives
  • HumanForest brings e-mopeds to London 
    December 28, 2021
    Vehicles can travel up to 28mph and join fleet of e-bikes already in UK capital