Skip to main content

'190,000 trips' on day 1 of Sydney Metro extension

15.5km extension means 2,645 new metro services will travel through city each week
By Adam Hill August 20, 2024 Read time: 2 mins
Lucky people (image: NSW Government | Sydney Metro)

More than 190,000 trips were made on the first day (19 August) of the Sydney Metro extension, according to NSW Government.

The new driverless service in the Australian city extends from the north-west, under the famous harbour for the first time, and through the Sydney central business district, with six brand-new underground stations - Crows Nest, Victoria Cross, Barangaroo, Martin Place, Gadigal and Waterloo - and new metro platforms at Central and Sydenham stations.  

The 15.5km extension is the latest stage of the M1 Northwest & Bankstown Line, which has stops at 21 stations between Tallawong and Sydenham. The remaining 13km of the M1 Line will open after the conversion of 10 existing stations on the T3 Bankstown Line.

Around 30 services per hour run at peak times, with capacity to move more people across Sydney Harbour in the busiest hour than the Sydney Harbour Bridge and Sydney Harbour Tunnel combined.

It means 2,645 new metro services will travel through the heart of the city each week, moving 17,000 people each way per hour in the morning rush hour.

A train runs every four minutes in the peak, seven minutes during weekdays between morning and afternoon peak services (increasing after the first month to a train every five minutes) and every 10 minutes during off peak and on weekends.

There are approximately 100 CCTV cameras at every station and 38 cameras inside each train, with 600 secure bike parking spaces at Crows Nest, Victoria Cross, Waterloo and Sydenham, as part of 900 new bike parking spaces across all eight stations.

Platform screen door technology keeps riders away from tracks.

Minister for transport Jo Haylen says: "This is the biggest change to Sydney’s public transport system since the opening of the Sydney Harbour Bridge. It’s going to double rail capacity across our harbour, take pressure off our heavy rail network and deliver a fantastic new transport service for passengers right across our city.”

Sydney Metro chief executive Peter Regan says the new M1 City Line is open "after a year of testing and commissioning, including more than 200 simulated exercises that have included disruption, emergency scenarios and security drills".

For more information on companies in this article

Related Content

  • Pöyry to design Helsinki’s Western Metro extension
    April 11, 2013
    Finnish consulting and engineering company Pöyry is to provide design services for the eight kilometre Western Metro extension in Espoo, the third largest city in Finland. It will be part of the metro system in the Helsinki capital region. The US$8.25 million contract, awarded by Länsimetro Oy, will bring the metro within the reach of 50,000 people in south-western parts of Espoo, and is expected to be complete by 2018. Pöyry has also provided track engineering, rock and geotechnical engineering, architect
  • TomTom launches speed cameras service in Brazil
    March 12, 2014
    TomTom’s speed cameras service is now available in Brazil. The company has worked with MapaRadar to enhance the service, which will be delivered directly to devices as a hosted service, or via a server-to-server bulk feed. Drivers will benefit from up-to-date warnings of nearby fixed and red light cameras, as well as speed enforcement zones. Car manufacturers can easily integrate the world-class service in their in-dash and mobile navigation systems. Backed by OpenLR, the open standard for "procedure
  • Mumbai metro line 1 celebrates first anniversary
    June 10, 2015
    A joint venture between RATP Dev and Transdev, the Mumbai metro line 1 started service on 8 June 2014 and is about to celebrate its first anniversary by crossing the 100 million passenger mark. The 12 kilometre line, with 12 stations and built on a viaduct, is the first in the city, the fifth most populated city in the world with a population of 22 million. The line connects the city’s eastern and western suburbs and has radically changed the daily life of people who previously depended on a bus net
  • Countering truckers’ parking conundrum
    May 3, 2017
    Colin Sowman hears about a new truck parking information system being piloted across eight states. Legislation limits truck drivers’ hours with the result that they are often caught in a situation where they need to stop either for a break or an overnight rest. But as truck parking is in short supply, truck drivers spend an average of 56 minutes a day searching for available spaces and are often faced with the choice of driving beyond their permitted hours or parking illegally.