Skip to main content

'190,000 trips' on day 1 of Sydney Metro extension

15.5km extension means 2,645 new metro services will travel through city each week
By Adam Hill August 20, 2024 Read time: 2 mins
Lucky people (image: NSW Government | Sydney Metro)

More than 190,000 trips were made on the first day (19 August) of the Sydney Metro extension, according to NSW Government.

The new driverless service in the Australian city extends from the north-west, under the famous harbour for the first time, and through the Sydney central business district, with six brand-new underground stations - Crows Nest, Victoria Cross, Barangaroo, Martin Place, Gadigal and Waterloo - and new metro platforms at Central and Sydenham stations.  

The 15.5km extension is the latest stage of the M1 Northwest & Bankstown Line, which has stops at 21 stations between Tallawong and Sydenham. The remaining 13km of the M1 Line will open after the conversion of 10 existing stations on the T3 Bankstown Line.

Around 30 services per hour run at peak times, with capacity to move more people across Sydney Harbour in the busiest hour than the Sydney Harbour Bridge and Sydney Harbour Tunnel combined.

It means 2,645 new metro services will travel through the heart of the city each week, moving 17,000 people each way per hour in the morning rush hour.

A train runs every four minutes in the peak, seven minutes during weekdays between morning and afternoon peak services (increasing after the first month to a train every five minutes) and every 10 minutes during off peak and on weekends.

There are approximately 100 CCTV cameras at every station and 38 cameras inside each train, with 600 secure bike parking spaces at Crows Nest, Victoria Cross, Waterloo and Sydenham, as part of 900 new bike parking spaces across all eight stations.

Platform screen door technology keeps riders away from tracks.

Minister for transport Jo Haylen says: "This is the biggest change to Sydney’s public transport system since the opening of the Sydney Harbour Bridge. It’s going to double rail capacity across our harbour, take pressure off our heavy rail network and deliver a fantastic new transport service for passengers right across our city.”

Sydney Metro chief executive Peter Regan says the new M1 City Line is open "after a year of testing and commissioning, including more than 200 simulated exercises that have included disruption, emergency scenarios and security drills".

For more information on companies in this article

Related Content

  • Rio’s TMC rises to Olympic challenge
    October 27, 2016
    Timothy Compston lifts the lid on Rio de Janeiro’s preparations for keeping its transport systems moving during the Olympics – and the outcome. Hosting the Olympics poses major traffic management challenges for any city and Rio was no exception – especially as it is already one of the world’s most congested cities. Beyond its normal 6.5 million inhabitants wanting to carry on their daily lives, in August Rio was also home to 11,300 athletes from 206 countries. Athletes who, without fail, had to reach their
  • Freight poses growing problem for city authorities
    March 3, 2017
    Wes Guckert considers possible solutions and countermeasures to the problems of increased freight deliveries in growing cities. In January 2016, the US Department of Transportation (USDoT) conducted a session on the SmartCity Challenge and Urban Freight and Logistics. This session was a follow-up to the USDoT report titled, Beyond Traffic 2045.
  • SkyTrain signals more work for Thales
    September 29, 2020
    Contract win extends manufacturer's SelTrac CBTC footprint in Vancouver’s mass transit system
  • Video analytics enhances urban rail safety
    December 16, 2016
    David Crawford explores some promising innovations for North American commuters. North America is experiencing a surge in commuter rail and metro development. The US now has 75 light rail and metro networks in operation; and California, in particular, is actively exploring ways of developing the state’s existing passenger rail operations into a fully integrated system.