Skip to main content

TransCore helps New York survive hurricane devastation

New York’s Traffic Management Centre faced its toughest test yet when Hurricane Sandy hit the United States at the end of October last year. Power was maintained to the building in Long Island City, Queens, throughout, although backup systems were operational and ready to supply critical transportation systems if power had been lost. Support from TransCore staff included making sure the TMC networks and transportation systems were operational, including the TransSuite Traffic Control System (TCS), which had
February 28, 2013 Read time: 2 mins
TransCore staff assisted in the aftermath of Hurricane Sandy, helping to get over 1400 intersections back online as New York returned to its feet (Pic: David Shankbone)

New York’s Traffic Management Centre faced its toughest test yet when Hurricane Sandy hit the United States at the end of October last year.

Power was maintained to the building in Long Island City, Queens, throughout, although backup systems were operational and ready to supply critical transportation systems if power had been lost.

Support from 139 Transcore staff included making sure the TMC networks and transportation systems were operational, including the TransSuite Traffic Control System (TCS), which had 8,200 intersections online. TCS made it through the storm without failing but by Monday as the eye of the storm had passed, there were intersections off-line due to flooding, loss of power and physical damage in the field.

On the Tuesday morning, the main optical fibre cable connecting the TCS to the city-wide wireless network was cut. However, TransCore determined that TCS was operational with no problem, and the TMC networks were not compromised.

The following day, Wednesday, the fibre was repaired and TransCore assisted by troubleshooting the intersections, working with the electricians and operators for the rest of the week. Intersections that could not be put back on line numbered about 700 in the flooded lower Manhattan area and the same number in flooded areas in Brooklyn and the outer boroughs.

Since NYCDOT’s headquarters were in the flooded area in lower Manhattan, commissioner Janette Sadik-Khan, her deputy Lori Ardato and their management group relocated to offices in the TMC building in Queens. They made periodic visits to the TMC, specifically to Bruce Schaller (deputy assistant commissioner in charge of the TMC), requesting reports on the status of the intersections.

Support continued into the beginning of the following week as the TMC continued its recovery efforts and as TransCore staff returned to work. The NYC TransCore office lost internet connection but never lost electricity. Most staff returned once public transportation resumed.

For more information on companies in this article

Related Content

  • TransCore wins three ITS contracts from Nevada DOT
    April 25, 2012
    TransCore has won three separate contracts to provide ITS design, construction and integration services for the Nevada Department of Transportation. The projects include a 30-mile extension of the FAST traffic management system along I-15 from outside Las Vegas to the California border; a 15-mile expansion of the FAST traffic management system along I-515 on the eastern side of the Las Vegas metropolitan area; and a 10-mile segment of I-80 in Reno, Nevada, as part of a roadway reconstruction project.
  • New Yorkers split on congestion pricing, tolling plan
    May 18, 2015
    In a recently published Quinnipiac University poll, 49 per cent of voters on New York opposed a proposal to toll the East River bridges and at the same time reduce tolls on the ‘outer borough’ bridges between the Bronx, Queens, Brooklyn and Staten Island and use the money for mass transit. Forty-four per cent backed the plan. Opposition to just setting tolls on the free East River bridges remains strong at 69 per cent, with just 27 per cent in favour, the independent poll finds. There is no group that co
  • Thales to upgrade New York’s Queens Boulevard subway line
    October 1, 2015
    In a contract worth US$49.6 million from the New York Metropolitan Transportation Authority (MTA), Thales is to upgrade the New York subway’s busy Queens Boulevard Line with its signalling solution. The contract includes the deployment of the Thales’s communications-based train control system, SelTrac CBTC, as well as the supply of equipment for the line’s train fleet. Design work for the Queens Boulevard Line is getting underway and installations are expected to begin in mid-2017.
  • Move New York launches public participation website
    November 24, 2015
    The Move NY team, which came up with a plan to improve New York’s transportation system by making the City’s tolling system fairer, has launched SmartParticipation (link http://nyc.smartparticipation.com/), a website dedicated to gathering public comments on congestion in New York City.