Skip to main content

Kuala Lumpur replaces obsolete traffic management system

With its integrated transport information system (ITIS) in ruins and waiting to be sold for salvage, Kuala Lumpur’s government has awarded a contract to improve its traffic management. GTC Global won the US$62 million contract last year to bring ITIS back on track. The company was recently acquired by Telekom Malaysia. In 2002, a traffic surveillance system costing more than US$93 million was launched to gather, process and supply real-time traffic information to reduce congestion in Kuala Lumpur. It we
April 9, 2014 Read time: 2 mins
With its integrated transport information system (ITIS) in ruins and waiting to be sold for salvage, Kuala Lumpur’s government has awarded a contract to improve its traffic management.  GTC Global won the US$62 million contract last year to bring ITIS back on track. The company was recently acquired by Telekom Malaysia.

In 2002, a traffic surveillance system costing more than US$93 million was launched to gather, process and supply real-time traffic information to reduce congestion in Kuala Lumpur. It went live in 2005 and less than two years later became a target for vandals and its technology soon became obsolete.

When Kuala Lumpur mayor Datuk Seri Ahmad Phesal Talib took office 18 months ago, the system was performing at 60 per cent capacity. He has guaranteed that the new system will be more cost-effective, efficient and able to keep pace with rapidly changing technological advances.

“We are confident of Telekom’s ability to handle this project, but this time, we are doing it differently. Instead of managing the system, we will lease the necessary equipment to them so that their contractor takes the risk,’’ said Ahmad Phesal.  “We expect ITIS to be fully restored by the middle of the year. We have finished installing 90 per cent of the CCTV units in the city to ensure public safety and the 140 variable message signs (VMS) are currently being installed and will be fully operational soon.”

ITIS is a federal government project developed by ITS Konsortium intended to solve Kuala Lumpur’s traffic congestion problem. The traffic management centre (TMC) links the system’s two main components, the advanced traffic management system (ATMS) and the advanced traveller information system (ATIS).  The system also includes 140 VMS, 255 CCTV and automatic incident detection. Traffic signals are linked to the TMC but are controlled separately.

Related Content

  • Growth of embedded car OEM telematics subscribers
    December 22, 2016
    According to a new research report by Berg Insight, the number of telematics service subscribers using embedded systems will grow at a compound annual growth rate (CAGR) of 36.4 per cent from 26.5 million subscribers at the end of 2015 to 170.2 million subscribers at the end of 2021. In addition, Berg Insight forecasts that shipments of embedded car OEM telematics systems worldwide will grow from almost 13.8 million units in 2015 at a CAGR of over 25.1 per cent to reach 52.8 million units in 2021. In Eur
  • Over US$2.3 billion of investment awarded to upgrade motorways in England
    July 23, 2015
    Highways England has appointed six joint-venture companies to design and build ten smart motorways across England as part of a US$2.3 billion investment. Three of these projects will start in autumn this year: two in the Midlands on the M1 J19 to J16 in Northamptonshire and the M5 J4a to J6 in Worcestershire, and one in the north-west on the M6 J16 to J19 near Stoke-on-Trent. The smart motorway schemes, part of the US$23 billion government investment Highways England is delivering between now and 2021
  • UK motorists concerned about increase in mobile phone use while driving
    November 23, 2016
    Over 86 per cent of UK motorists think distraction caused by mobile phones has become worse in the last three years, according to the second Safety Culture Survey commissioned by road safety charity IAM RoadSmart. In second place was congestion at 81 per cent, reflecting the increasing number of vehicles on the roads as the recession ends. Of the 2,000 UK drivers surveyed, nearly three quarters believed aggressive driving had worsened over the last three years, with more than 60 per cent reporting the
  • Graham Construction wins ITS system contract on Forth replacement crossing
    April 19, 2012
    Graham Construction has won the contract, worth over US$21 million, to provide the state-of-the-art ITS for the new Forth Bridge replacement crossing in Scotland. The company will deliver the traffic flow management system along the M90 to control traffic flow using overhead signal gantries and provide motorists with current travel updates via variable message boards. The ITS contract is to provide and install seventeen gantries, along with foundations and associated maintenance lay-bys. Further work wi