Skip to main content

Kuala Lumpur replaces obsolete traffic management system

With its integrated transport information system (ITIS) in ruins and waiting to be sold for salvage, Kuala Lumpur’s government has awarded a contract to improve its traffic management. GTC Global won the US$62 million contract last year to bring ITIS back on track. The company was recently acquired by Telekom Malaysia. In 2002, a traffic surveillance system costing more than US$93 million was launched to gather, process and supply real-time traffic information to reduce congestion in Kuala Lumpur. It we
April 9, 2014 Read time: 2 mins
With its integrated transport information system (ITIS) in ruins and waiting to be sold for salvage, Kuala Lumpur’s government has awarded a contract to improve its traffic management.  GTC Global won the US$62 million contract last year to bring ITIS back on track. The company was recently acquired by Telekom Malaysia.

In 2002, a traffic surveillance system costing more than US$93 million was launched to gather, process and supply real-time traffic information to reduce congestion in Kuala Lumpur. It went live in 2005 and less than two years later became a target for vandals and its technology soon became obsolete.

When Kuala Lumpur mayor Datuk Seri Ahmad Phesal Talib took office 18 months ago, the system was performing at 60 per cent capacity. He has guaranteed that the new system will be more cost-effective, efficient and able to keep pace with rapidly changing technological advances.

“We are confident of Telekom’s ability to handle this project, but this time, we are doing it differently. Instead of managing the system, we will lease the necessary equipment to them so that their contractor takes the risk,’’ said Ahmad Phesal.  “We expect ITIS to be fully restored by the middle of the year. We have finished installing 90 per cent of the CCTV units in the city to ensure public safety and the 140 variable message signs (VMS) are currently being installed and will be fully operational soon.”

ITIS is a federal government project developed by ITS Konsortium intended to solve Kuala Lumpur’s traffic congestion problem. The traffic management centre (TMC) links the system’s two main components, the advanced traffic management system (ATMS) and the advanced traveller information system (ATIS).  The system also includes 140 VMS, 255 CCTV and automatic incident detection. Traffic signals are linked to the TMC but are controlled separately.

Related Content

  • Freeway management system for Sydney's M4 motorway
    August 28, 2012
    In a bid to improve Sydney's roads and congestion, Australia's Federal and New South Wales governments are to jointly fund a project to equip the full length of the state's M4 motorway with technology which will improve traffic flows and ease congestion along this vital part of Sydney's road network. The US$17 million project will provide the M4 with an electronic freeway management system consisting of variable speed limit sign, entry ramp signalling, CCTV, digital traveller information signs, and signs ad
  • Bluetooth speed and travel data collection shows cost savings
    February 2, 2012
    Houston TranStar is using Bluetooth sensors to collect speed and travel data in a project which is already demonstrating significant cost savings
  • LA transport to receive fibre-optic boost
    December 8, 2020
    Network is expected to aid the development of smart city applications
  • Motorists want roads repaired before smart motorways, says survey
    December 5, 2014
    According to research by Bury-based online car supermarket JamJar Direct, which indicates that 47 per cent of Greater Manchester motorists claim to have been affected by the construction works, communications around the M60 smart motorway improvements are sorely lacking. Almost two thirds of Greater Manchester motorists (62 per cent) are aware that the M60 is being turned into a smart motorway, but over 40 per cent, equivalent to 81,000 vehicles per day using affected stretch of M60 between junctions 8 a