Skip to main content

Kuala Lumpur replaces obsolete traffic management system

With its integrated transport information system (ITIS) in ruins and waiting to be sold for salvage, Kuala Lumpur’s government has awarded a contract to improve its traffic management. GTC Global won the US$62 million contract last year to bring ITIS back on track. The company was recently acquired by Telekom Malaysia. In 2002, a traffic surveillance system costing more than US$93 million was launched to gather, process and supply real-time traffic information to reduce congestion in Kuala Lumpur. It we
April 9, 2014 Read time: 2 mins
With its integrated transport information system (ITIS) in ruins and waiting to be sold for salvage, Kuala Lumpur’s government has awarded a contract to improve its traffic management.  GTC Global won the US$62 million contract last year to bring ITIS back on track. The company was recently acquired by Telekom Malaysia.

In 2002, a traffic surveillance system costing more than US$93 million was launched to gather, process and supply real-time traffic information to reduce congestion in Kuala Lumpur. It went live in 2005 and less than two years later became a target for vandals and its technology soon became obsolete.

When Kuala Lumpur mayor Datuk Seri Ahmad Phesal Talib took office 18 months ago, the system was performing at 60 per cent capacity. He has guaranteed that the new system will be more cost-effective, efficient and able to keep pace with rapidly changing technological advances.

“We are confident of Telekom’s ability to handle this project, but this time, we are doing it differently. Instead of managing the system, we will lease the necessary equipment to them so that their contractor takes the risk,’’ said Ahmad Phesal.  “We expect ITIS to be fully restored by the middle of the year. We have finished installing 90 per cent of the CCTV units in the city to ensure public safety and the 140 variable message signs (VMS) are currently being installed and will be fully operational soon.”

ITIS is a federal government project developed by ITS Konsortium intended to solve Kuala Lumpur’s traffic congestion problem. The traffic management centre (TMC) links the system’s two main components, the advanced traffic management system (ATMS) and the advanced traveller information system (ATIS).  The system also includes 140 VMS, 255 CCTV and automatic incident detection. Traffic signals are linked to the TMC but are controlled separately.

Related Content

  • Growth of ITS market 2013 to 2019
    April 22, 2014
    According to the latest report from Transparency Market Research, the intelligent transportation systems (ITS) market is expected to reach a value of US$30.2 billion by 2019, at a CAGR of 11.1 per cent from 2013 to 2019. The demand of ITS systems is rising globally due to increased congestion in metropolitan areas. Development and deployment of intelligent transportation system not only reduces traffic, but also reduces number of accidents and improves quality of life by controlling vehicle emission leve
  • Making the case for ALPR in enforcement
    February 2, 2012
    Federal Signal's Brian Shockley uses examples from around the world to make the case for the greater use of automatic license plate recognition technology in the US. It is time, he says, to consider the possibilities of a national network and the use of average speed enforcement
  • Keeping over-height and overheating vehicles out of tunnels
    October 7, 2013
    A review of pre-warning solutions for problematic commercial vehicles approaching tunnels
  • Urban tunnel replaces viaduct, improves safety
    October 10, 2012
    Earthquake sensors, automatic barriers and real time monitoring systems are all part of a scheme to make a major Seattle traffic artery safer, by taking it underground. Huw Williams reports. Seattle’s metropolitan area of 3.5 million people, like much of the western seaboard of the United States, lies in an earthquake zone. In Seattle’s case, the city and its hinterland sit atop a complex network of interrelated active geological faults capable of severe seismic activity and posing complex considerations fo