Skip to main content

Kuala Lumpur replaces obsolete traffic management system

With its integrated transport information system (ITIS) in ruins and waiting to be sold for salvage, Kuala Lumpur’s government has awarded a contract to improve its traffic management. GTC Global won the US$62 million contract last year to bring ITIS back on track. The company was recently acquired by Telekom Malaysia. In 2002, a traffic surveillance system costing more than US$93 million was launched to gather, process and supply real-time traffic information to reduce congestion in Kuala Lumpur. It we
April 9, 2014 Read time: 2 mins
With its integrated transport information system (ITIS) in ruins and waiting to be sold for salvage, Kuala Lumpur’s government has awarded a contract to improve its traffic management.  GTC Global won the US$62 million contract last year to bring ITIS back on track. The company was recently acquired by Telekom Malaysia.

In 2002, a traffic surveillance system costing more than US$93 million was launched to gather, process and supply real-time traffic information to reduce congestion in Kuala Lumpur. It went live in 2005 and less than two years later became a target for vandals and its technology soon became obsolete.

When Kuala Lumpur mayor Datuk Seri Ahmad Phesal Talib took office 18 months ago, the system was performing at 60 per cent capacity. He has guaranteed that the new system will be more cost-effective, efficient and able to keep pace with rapidly changing technological advances.

“We are confident of Telekom’s ability to handle this project, but this time, we are doing it differently. Instead of managing the system, we will lease the necessary equipment to them so that their contractor takes the risk,’’ said Ahmad Phesal.  “We expect ITIS to be fully restored by the middle of the year. We have finished installing 90 per cent of the CCTV units in the city to ensure public safety and the 140 variable message signs (VMS) are currently being installed and will be fully operational soon.”

ITIS is a federal government project developed by ITS Konsortium intended to solve Kuala Lumpur’s traffic congestion problem. The traffic management centre (TMC) links the system’s two main components, the advanced traffic management system (ATMS) and the advanced traveller information system (ATIS).  The system also includes 140 VMS, 255 CCTV and automatic incident detection. Traffic signals are linked to the TMC but are controlled separately.

Related Content

  • Best served warm
    February 27, 2012
    Like many, I'm a creature of habit. Day to day, those who know me can usually find me in one of a very few places doing very much the same things.
  • What's next for transport communication systems?
    February 2, 2012
    Moxa Americas, Inc.'s Charles Chen ponders the way forward for transportation communications networks in the US
  • Silos are last century’s thinking
    April 21, 2016
    After 45 years in transportation, Ken Philmus sees the need for major change in a sector currently ill-prepared to meet the challenge of funding and rapidly advancing technological change. Having worked in both the public and private sectors, Ken Philmus, currently senior vice president of transportation solutions at Xerox, appreciates both approaches, but times are changing and he believes the sector needs to change too. “I like trains, planes and automobiles but I love the concept of mobility and that’s w
  • MVIS, HRS partner on workzone safety
    September 19, 2014
    Mobile Visual Information Systems (MVIS) and the creator of the Intellicone temporary work zone safety system, Highway Resource Solutions (HRS), have teamed up to create the Safelane automated traffic management system and the Multisafe Smart VMS. The companies say these are the first temporary road maintenance safety solutions to combine industry-leading modular electronic perimeters and variable message signs (VMS), providing a cost-efficient method of improving the safety of both road workers and road