Skip to main content

Kuala Lumpur replaces obsolete traffic management system

With its integrated transport information system (ITIS) in ruins and waiting to be sold for salvage, Kuala Lumpur’s government has awarded a contract to improve its traffic management. GTC Global won the US$62 million contract last year to bring ITIS back on track. The company was recently acquired by Telekom Malaysia. In 2002, a traffic surveillance system costing more than US$93 million was launched to gather, process and supply real-time traffic information to reduce congestion in Kuala Lumpur. It we
April 9, 2014 Read time: 2 mins
With its integrated transport information system (ITIS) in ruins and waiting to be sold for salvage, Kuala Lumpur’s government has awarded a contract to improve its traffic management.  GTC Global won the US$62 million contract last year to bring ITIS back on track. The company was recently acquired by Telekom Malaysia.

In 2002, a traffic surveillance system costing more than US$93 million was launched to gather, process and supply real-time traffic information to reduce congestion in Kuala Lumpur. It went live in 2005 and less than two years later became a target for vandals and its technology soon became obsolete.

When Kuala Lumpur mayor Datuk Seri Ahmad Phesal Talib took office 18 months ago, the system was performing at 60 per cent capacity. He has guaranteed that the new system will be more cost-effective, efficient and able to keep pace with rapidly changing technological advances.

“We are confident of Telekom’s ability to handle this project, but this time, we are doing it differently. Instead of managing the system, we will lease the necessary equipment to them so that their contractor takes the risk,’’ said Ahmad Phesal.  “We expect ITIS to be fully restored by the middle of the year. We have finished installing 90 per cent of the CCTV units in the city to ensure public safety and the 140 variable message signs (VMS) are currently being installed and will be fully operational soon.”

ITIS is a federal government project developed by ITS Konsortium intended to solve Kuala Lumpur’s traffic congestion problem. The traffic management centre (TMC) links the system’s two main components, the advanced traffic management system (ATMS) and the advanced traveller information system (ATIS).  The system also includes 140 VMS, 255 CCTV and automatic incident detection. Traffic signals are linked to the TMC but are controlled separately.

Related Content

  • Latest ITS, traffic management systems from Siemens
    June 2, 2015
    Siemens Intelligent Traffic Systems has introduced several new and innovative products this year which will be highlighted here at the ITS America Annual Meeting. The new products include the m60 series traffic controllers, Tactics 3 traffic management system and Tactics smartGuard cloud-based traffic management system. The new m60 series traffic controllers include the m62 ATC, m62 ATC LITE and the m62 NEMA models. The m60 series builds on Siemens’ m50 hardware platform, making the m60 series compatibl
  • Cost benefit: Toronto retimings tame traffic trauma
    July 19, 2018
    Canada’s largest city reckons that it is saving its taxpayers’ money simply by altering the way traffic lights work. David Crawford reviews Toronto’s ambitious plans to ease congestion Toronto, Canada’s largest metropolis (and the fourth largest in North America), has saved its residents CAN$53 (US$42.4) for every CAN$1 (US$0.80) spent over a 2012-2016 traffic signal retiming programme, according to figures released by its Transportation Services Division. The programme covered 1,275 signals (the city’s
  • Cost benefit: Toronto retimings tame traffic trauma
    July 11, 2018
    Canada’s largest city reckons that it is saving its taxpayers’ money simply by altering the way traffic lights work. David Crawford reviews Toronto’s ambitious plans to ease congestion. Toronto, Canada’s largest metropolis (and the fourth largest in North America), has saved its residents CAN$53 (US$42.4) for every CAN$1 (US$0.80) spent over a 2012-2016 traffic signal retiming programme, according to figures released by its Transportation Services Division. The programme covered 1,275 signals (the city’s to
  • Colombian highway sees ITS tested to the extreme
    November 13, 2014
    One of the most challenging road construction and ITS projects currently underway is the upgrading of the road from Bogota to Villavicencio. Currently it takes four hours to make the 86km journey between Bogota and Villavicencio using the existing single lane in each direction road which passes through some very challenging terrain. It is the only ground connection between central Colombia and the eastern region which represents 40% of the country’s territory.