Skip to main content

Georgia Tolls contracts awarded

Georgia Tolls has awarded contracts for their second and third toll express lanes project on I-75 south and I-75/575 northwest. With national interoperability planned they require the toll systems supplier to install multi-protocol readers on the toll gantries to E-ZPass transponders as well as 6C sticker tags. Toll system integrator will be 3M who is to provide the toll system including vehicle detection, tracking and classification loops, 3-protocol RF readers, license plate imaging cameras and illumin
December 20, 2013 Read time: 1 min
Georgia tolls has awarded contracts for their second and third toll express lanes project on I-75 south and I-75/575 northwest. With national interoperability planned they require the toll systems supplier to install multi-protocol readers on the toll gantries to E-ZPass transponders as well as 6C sticker tags.

Toll system integrator will be 3M who is to provide the toll system including vehicle detection, tracking and classification loops, 3-protocol RF readers, license plate imaging cameras and illuminators, variable signage to inform motorists of current toll rates, zone controllers, power and power backup and communications and video surveillance. They will also provide links to 507 GDOT’s NaviGAtor system and Georgia toll’s traffic management centre, the interface with a back office by others and system maintenance.  Equipment must be certified as 6C capable by 808 OmniAir Certification Services.

For more information on companies in this article

Related Content

  • LPR to combat lost tolling revenues
    January 31, 2012
    Perceptics has launched a new licence plate reader (LPR) aimed at turnpike authorities and e-tolling system integrators to help capture more unpaid tolling revenue from violators. The company claims its new system is a higher performance technology designed to capture license plate data across a wider field of view than existing LPR systems, enabling authorities to read data in situations where a vehicle changes lanes. According to Perceptics, vehicles without pre-paid tolling transponders will typically ch
  • Colombian highway sees ITS tested to the extreme
    November 13, 2014
    One of the most challenging road construction and ITS projects currently underway is the upgrading of the road from Bogota to Villavicencio. Currently it takes four hours to make the 86km journey between Bogota and Villavicencio using the existing single lane in each direction road which passes through some very challenging terrain. It is the only ground connection between central Colombia and the eastern region which represents 40% of the country’s territory.
  • Potential game-changing MoU on tolling and ITS market cooperation for North America
    February 2, 2012
    Kapsch TrafficCom IVHS Corporaton and Federal Signal Corporation have entered into a Memorandum of Understanding after substantial discussions during the past few months regarding ways in which the two organisations might cooperate and jointly pursue mutual business interests in North America.
  • Developing an integrated WIM/ANPR enforcement system
    July 31, 2012
    The weigh in motion market remains especially buoyant and technological development continues to reflect this. Although there are major differences in operating philosophies, particularly between developed and developing countries, both the numbers of countries using Weigh In Motion (WIM) technology and the numbers of systems that they deploy are on the increase.